Laserfiche WebLink
NITROGEN SYSTEM POINT OF CONNECTION SCHEDULE <br /> INTERFACE COORDINATE LOCATION LEGEND <br /> CONNECTION BUILDING P& ID X Y Z CONNECTION SEE SHEETS 40-58-M1a-a,40-58-M1b-a,&40-58-M2a-a FOR KEY, <br /> POC NO SYSTEM PURPOSE SIZE MEDIA FLOW RATE TEMPERATURE PRESSURE DWG REFERENCE COORDINATE COORDINATE COORDINATE ORIENTATION CONNECTION TYPE LEGEND,AND GENERAL NOTES. <br /> N8A NITROGEN VAPORIZER A VAPORIZER OVERFLOW 691 WATER 30 GPM 212F MAX 0 PSIG M313A-a -11'-9 63/64!1 17' 1/2"5 1'- 101/211 HORIZONTAL 150#ASME B16.5-2009 R.F.S.O. FLG X INDICATES GUIDED LINE STOP(X,Y,Z)FOR PIPING. <br /> N8B NITROGEN VAPORIZER B VAPORIZER OVERFLOW 6" WATER 30 GPM 212F MAX 0 PSIG M313A-a -11'-9 63/64" 41'-5 127/256" 1'- 10 1/2" HORIZONTAL 150#ASME B16.5-2009 R.F.S.O. FLG <br /> N13A NITROGEN VAPORIZER A STEAM TRAIN INLET 2 1/2" STEAM 12,000 LBS/HR 382F 200 PSIA M313A-a 21'-0 69/256" 18'-7 11/256" 2'-4" HORIZONTAL 300#ASME B16.5-2009 R.F.W.N.F I-1 INDICATES GUIDED SUPPORT FOR PIPING((X,Z)OR(Y,Z)). <br /> N13B NITROGEN VAPORIZER B STEAM TRAIN INLET 2 1/2" STEAM 12,000 LBS/HR 382F 200 PSIA M313A-a 21'-0 69/256" 42'-7 3/64" 2'-4" HORIZONTAL 300#ASME B16.5-2009 R.F.W.N.F INDICATES VERTICAL SUPPORT(Z)FOR PIPING. <br /> Z1 NITROGEN VAPORIZER SYSTEM GN2 PROCESS OUTLET 14" N2 56,000 SCFM 70 F 210 PSIG M313A-a -22'- 2 53/64" -4'-5 25/128" 3'-0" HORIZONTAL 300#ASME B16.5-2009 R.F.W.N.F <br /> COORDINATES: <br /> N15A NITROGEN VAPORIZER A STEAM TRAIN DRIP TRAP 3/4" CONDENSATE 150 LBS/HR 382F 200 PSIA M313A-a 19'-2 3/4" 18'-7 11/256" 1'-6" HORIZONTAL N.P.T.F. x=NORTH-SOUTH <br /> N15B NITROGEN VAPORIZER B STEAM TRAIN DRIP TRAP 3/4" CONDENSATE 160 LBS/HR 382F 200 PSIA , M313A-a 19'-2 3/4" 42'-7 3/64" 1'- 6" HORIZONTAL N.P,T,F, Y=EAST-WEST <br /> Z=VERTICAL <br /> I <br /> - — - -- <br /> - <br /> , �-- F.1 GENERAL NOTES <br /> 8 300 LB CLASS FLANGED GATE VALVE PER ASME B16.34, CAST <br /> FUTURE LIN CARBON STEEL PER ASTM A216 GRADE WCB, BOLTED BONNET <br /> (I'- IEWPROVIDE GUIDED SUPPORT FOR PIPING AT LOCATION INDICATED. <br /> TANK Ie OS&Y CONFIGURATION,API 5 TRIM, LARGEST BYPASS AVAILABLE <br /> (BY OTHERS) FOR STANDARD VALVE SIZE WITH A GLOBE THROTTLING VALVE 1 EW STEAM POC N13B TO VAPORIZER B. <br /> . AND A TWO PASS WELD OF BYPASS PIPING TO VALVE BODY LUGS. <br /> ".' I <br /> '___- II: 4 111W 3/4"HP CONDENSATE FROM STEAM TRAIN DRIP TRAP. <br /> DOUBLE BACK TO BACK WELD NECK FLANGES i , <br /> WITH SOCK-O-LET, 1/2"NIPPLE: 1/2"SOCKET BY 4 OVERFLOW POC N8B FROM VAPORIZER B. <br /> NPT GATE VALVE AND BULL PLUG. I <br /> - DOUBLE BLOCK&BLEED W/INTEGRAL BY-PASS, © HPS DRIP LEG TO STEAM TRAP AT THE BOTTOM OF STEAM RISER. <br /> , TYPICAL. INSULATION NOT SHOWN FOR CLARITY, <br /> '� - 8"300 LB CLASS FLANGED SHORT PATTERN i ROUTE HP CONDENSATE FROM STEAM TRAP TO FLASH TANK. <br /> TRIPLE OFFSET HIGH PERFORMANCE BUTTERFLY t 1 6 STEAM TRAIN DRIP TRAP POC N15B FROM VAPORIZER B. <br /> VALVE PER ASME B16.10,API 609 ( 1 <br /> _$ CONFORMANCE, CAST CARBON STEEL PER ASTfv <br /> A216 GRADE WCB BODY&DISK,ALLOY 21 BODY <br /> _ a� _ ,70i SEAT,, SOLID 316 SST DISK SEAL, CLASS 5 <br /> - - -- SHUTOFF,J.C.3871 &GRAPHITE PACKING.GEAR ®',, IMI <br /> OPERATOR WITH SHAFT NOTCHED FOR ANY 90 f <br /> DEG MOUNTING, ---- "/� I <br /> NITROGEN SUPPLY SYSTEM ,_ r- <br /> - CONCRETE PAD, REFER TO YD- 3" FULL PORT GATE VALVE. <br /> �' :� 40 YD C220 29 FOR SITING, _._ �° S_! �o ] <br /> �` FENCING, ETC. . II;EXISTING LIN TA,NI/, _ t <br /> (BY OTHERS).TT. == <br /> OF 3, REFER T _ � <br /> \ APCI DRAWINGS,' V <br /> c <br /> ''‘,*.;',___„--/ ; ilij 11'6---- . MI 1 Ire i <br /> '-- 8" HPS WITH 5"THICK INSULATION, <br /> -� ���� BOI 4'-415/16"ABOVE GRADE. CONSTRUCTION NOTES <br /> _I 3"CONDENSATE WITH 2-1/2"THICK INSULATION <br /> _ CONNECT LP PRESSURE CONDENSATE CONNECTIONS TO EXISTING. <br /> BOI 2'-9"ABOVE GRADE. <br /> 2. Z-COORDINATE IS FROM PIPE CL TO TOP OF SLAB FOR HORIZONTAL POCS. <br /> I <br /> '� - 14"GN2, BOP 0' 6"ABOVE GRADE. DUE TO SLOPE OF PAD,CONTRACTOR SHALL FIELD VERIFY POC ELEVATIONS. <br /> UTILITIES SECTION AT NITROGEN SUPPLY 3. THE ORIGIN FOR THE POC INTERFACE COORDINATES THE INTERSECTION <br /> g __ _ OF COL,LINE 5&F.25,WITH+X IN THE NORTH DIRECTION,+Y IN THE EAST <br /> I ,_-_ SYSTEM DIRECTION, <br /> DIRECTION,AND+Z IN THE UP DIRECTION. <br /> TOP TO BOTTOM: `' �'� / 2 4. EQUIPMENT AND PIPING SHOWN WITH GREY SOLID LINES REPRESENT <br /> 8"HPS W/ 5"THICK INSULATION / FUTURE LIN SCALE: 1/4"= 1'-O" M543a M543a FUTURE AND/OR EXISTING PIPING/EQUIPMENT.EQUIPMENT AND PIPING <br /> 3" CONDENSATE W/2-1/2"THICK INSULATION i TANK AUTO VENT VAPORIZER, BY �_, SHOWN IN GREY DASHED LINES REPRESENTS PIPING/EQUIPMENT BY <br /> ' `�- OTHERS, REFER TO APCI <br /> OTHERS. <br /> 14"GN2 -� I ',, (BY OTHERS) ;' DRAWINGS <br /> 1 ROUTE STEAM UP AND OVER TRAFFIC AISLE WITH BOTTOM OF INSULATION <br /> I 5 -9„ ` � I <br /> -4, - — VAPORIZER A EXISTING CONTROL AT 7'-0". <br /> , PANEL, BY OTHERS, REFER TO <br /> A <br /> APCI DRAWINGS 6 CONNECT NEW HP PRESSURE CONDENSATE CONNECTIONS TO EXISTING. <br /> NORTH FACE OF ,' s—" . - I __ _ <br /> BLDG.40-58 - r-i- <br /> REMOVE BLIND FLANGE AND CONNECT NEW STEAM PIPE TO EXISTING WELD- <br /> «> f VAPORIZER B CONTROL PANEL, NECK FLANGE VIA A NEW WELD-NECK FLANGE. <br /> M543a M543a <br /> 4 - BY OTHERS <br /> �., .f . ORIGIN iiii<O z STEAM SPARGER <br /> I I: MANIFOLD,BY OTHERS <br /> m <br /> r - u' `� =°1 Mgt, <br /> Ill T <br /> LDORIZERCIRCULATIdN <br /> , PIN AND ASSOCIATED i REFERENCE DRAWINGS <br /> WIPING,BY OTHERS,TYP., I' I <br /> REFER TO APCI DRAWINGS u <br /> ° VAPORIZER A(BY I \, > ; ;;-----' ;'; 1.REFER TO DRAWING 40-58-M313A-a FOR STEAM AND <br /> `' 1 5 OTHERS), EXISTING, 4" * " s= CONDENSATE FLOW AND CONTROL DIAGRAM. <br /> REFER TO AP�;' Lille Hsu 1I <br /> ' DRAWING PAAC - `, <br /> I <br /> e€ a 1 I :- `e`er It <br /> 1 , I ♦,ems ,, 4 r , , , „ 1 I— 1 ! �%> o ,i�, ,..�.�: �' <br /> II' i 1 ' f w ' l e i II <br /> 1 �, ` r <br /> , 11 :1: <br /> LI d! — 7 cc SS1 II I i I 1 `-1 ei '/ t, — tt ,;�—._.—'`!'y °L - <br /> v <br /> f f I 1 i t I I <br /> {i g� g_ , 4 4 <br /> I I STEAM VALVE ''' �'' <br /> „k_ I <br /> I, ,z7 W <br /> TRAIN,BY OTHERS `^r' `� �' <br /> t ! '\,rit— r; PS HPG1 -4-4 rgil <br /> 0 <br /> II 11 <br /> . . VAPORIZER TUBE PULL _1 Y _ 7: / <br /> _ ter— i 1 ` ; <br /> REQUIREMENT TYP i _ _ <br /> �90QEOCP) \ ) 1 CIRCULATOR PUMP AND PS HPC 8 <br /> ` ASSOCIATED PIPING,BY VAPORIZER DRAIN <br /> 1 1= e ; OTHERS 6 E. VALVE,BY OTHERS <br /> 0_ i i VAPORIZER B d i 1 ! <br /> ril- <br /> FT I I ' ' ' STEAM TRAP(BY OTHERS, <br /> ' `' (BY OTHERS) '` PS-HPC-7 NW REFER TO APCI DRAWINGS) ©\ <br /> 1' i i , , i 1 1 <br /> I i 1 , I, , ',; <br /> \ 05 `� \,,,`. 6 °, : I—{ i e i r` ! /1 f ; i , ; f £ i <br /> _.-w 1 --t----",_ — It <br /> — n- I ` o.— — f[ <br /> PS-HPC-5 I , i 1 , 4. r ie N�, , 1 , 1e <br /> *No I , I <br /> wi ' el '/'____ ____w______� � � 1d SECTION AT NITROGEN VAPORIZER 3 <br /> 1...! :-'1..: . . . . If 2 Y .y ,, / I <br /> \ .� -w q t PS HPC ' 1— a,=_ ; SCALE: 1/4"= 1'-0" M543a M543a <br /> i4- iii I1~ ta$ PS S 3 - <br /> PS HPG9(TOP) 4 , 3 , 6 <br /> PS-S-5(BOTTOM) > \ <br /> PS-HPC-1 <br /> - � O <br /> nr ,' 1 o N ASNO � 0 2' 4' 8' 12' <br /> 4111 p �� �, <br /> M543a M543a PS HPC-3 PS HPC 2 , <br /> PS—S-2 PS-S-1 11111111 <br /> _ _ � � �� � � ,11,• <br /> '` �,- 1/4 = 1-0 <br /> 11 I <br /> �*;,max , J 0 4' 8' 16' 24' <br /> PS -6 ENLARGED NITROGEN SUPPLY SYSTEM INTERFACE �` ` f <br /> www.brph,Com �,0pyr�g}tt D 2018 �. „ � , ,:. <br /> PLAN Architects Engineers Inc. 51476 <br /> i902G ,3301Lt W,ate 00 d SSIONAL v.s . <br /> SCALE: 1/8 1 -02 �� <br /> II= 1 11 <br /> ngineering 1ta.313&73123rs512 'n 1 .:¢'" d <br /> DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE c <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE of WAs6, accEPTABILITY JXK 06/12/18 NITROGEN SYSTEM UTILITIES DETAILS OC. <br /> P�� "�r THIS DESIGN AND/OR CHECKED W2548317 06/12/18 C. <br /> 0 ISSUE FOR CONSTRUCTION JXK JLC 06/12/18 5 SPECIFICATION IS APPROVED JEW 06/12/18 SHEETco <br /> ® BRPHARCHITECTs ENGINEER TITLE Boeing 777X CWC BUILDING AIV/I/ ' if ',.,-.: ."' ' ENGINEERS INC. APPROVED BY DEPT. DATE JLC 06/12/18 543a <br /> BUILDING 40-58 <br /> ell....— 4,00.. <br /> Co <br /> `"�T�,� ....... <br /> APPROVED JOB NO. COMP NO. - <br /> P 40-58 M543a <br /> q 1' of AUTNOc'�� APPROVED DWG NO. <br /> MECHANICAL MASTER EVERETT,WA 40-58-M543a <br />