Laserfiche WebLink
ORIGINAL <br /> it <br /> EVERETT <br /> WASHINGTONMOM CITY OF EVERETT, WASHINGTON <br /> CONTRACT <br /> THIS CONTRACT is made and entered into thistL_ day ofL �, 2021, byand between the <br /> Cityof Everett, Washington, a municipal corporation existingnder4he-Yaws of the State of <br /> g p p <br /> Washington, hereinafter called the "City", and Automatic Door & Gate, a Corporation hereinafter <br /> called the "Contractor." <br /> In consideration of the sums to be paid to it by the City, Contractor hereby covenants and agrees to <br /> furnish all labor, tools, materials, equipment, and supplies required to build and construct in a <br /> workmanlike manner the work, improvements, and appurtenances in accordance with the <br /> Specifications and Plans entitled: <br /> SWR INVITATION FOR QUOTE #2021-073 <br /> SOUTH PRECINCT WEST GATE REBUILD <br /> The following documents ("Contract Documents") are incorporated by reference and are hereby made <br /> a part of this Contract: <br /> A. Invitation for Quote <br /> B. Information for Contractors <br /> C. General and Special Conditions <br /> D. Technical Specifications and Contract Drawings <br /> E. Change Orders (if any) <br /> F. Addenda (if any) <br /> G. Quote Proposal submitted by the Contractor as to those items and/or alternatives <br /> accepted by the City (Conformed copy dated June 23, 2021.) <br /> H. Payment and Performance Bond <br /> All provisions required by law whether here inserted or not <br /> J. Project Plans and Drawings <br /> K. Supplemental Drawings <br /> L. Permits <br /> M. All provisions required by law whether set forth and reproduced herein or not <br /> The work shall be physically complete in all respects within forty-five (45) calendar days from the date <br /> of issuance of the Notice to Proceed. The parties agree the City will suffer damage and be put to <br /> additional expense in the event that the Contractor does not complete the work in all respects and <br /> have it ready for use by the physical completion date stated. <br /> The amount of this contract is Sixty-Three Thousand Six Hundred Eight-Four and Zero Cents <br /> ($63,684.00) and is based on the quote submitted by the Contractor dated June 23, 2021. <br /> The basis for final payment will be the actual amount of work performed according to the Contract <br /> Documents and payments, whether partial or final, shall be made as specified therein. If, and to the <br /> extent, payment (in whole or in part) is based upon unit prices multiplied by quantities of work actually <br />