My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Automatic Door & Gate 7/26/2021
>
Contracts
>
Small Works
>
Purchase
>
Automatic Door & Gate 7/26/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2021 11:58:21 AM
Creation date
8/6/2021 11:57:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Automatic Door & Gate
Approval Date
7/26/2021
Department
Purchasing
Department Project Manager
Trevor Kyllingmark/Doug Acheson
Subject / Project Title
South Precinct West Gate Rebuild 2021-073
Tracking Number
0003012
Total Compensation
$63,684.00
Contract Type
Small Works
Contract Subtype
Purchase
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. For all sums which the insured becomes le- C. When coverage for liability arising out of the <br /> gaily obligated to pay as damages caused by "products- completed operations hazard" is <br /> "occurrences" under Section I - Coverage A, provided, any payments for damages be- <br /> and for all medical expenses caused by ac- cause of "bodily injury" or "property dam- <br /> cidents under Section I - Coverage C, which age" included in the "products-completed op- <br /> cannot be attributed only to ongoing oper- erations hazard" will reduce the <br /> ations at a single designated construction Products-completed Operations Aggregate <br /> project shown in the Schedule above: Limit, and not reduce the General Aggregate <br /> 1. Any payments made under Coverage A Limit nor the Designated Construction Project <br /> for damages or under Coverage C for General Aggregate Limit. <br /> medical expenses shall reduce the D. If the applicable designated construction <br /> amount available under the General Ag- project has been abandoned, delayed, or <br /> gregate Limit or the Products-completed abandoned and then restarted, or if the au- <br /> Operations Aggregate Limit, whichever is thorized contracting parties deviate from <br /> applicable; and plans, blueprints, designs, specifications or <br /> 2. Such payments shall not reduce any Des- timetables, the project will still be deemed to <br /> ignated Construction Project General Ag- be the same construction project. <br /> gregate Limit. E. The provisions of Section III - Limits Of Insur- <br /> ance not otherwise modified by this endorse- <br /> ment shall continue to apply as stipulated. <br /> CG 25 03 05 09 © Insurance Services Office, Inc., 2008 Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.