Laserfiche WebLink
NOTES: NOTES: J I I NOTES: <br /> 1. WOOD TRUSS PER PLAN 1. TRUSSES PER PLAN 1. 2x OR VALLEY SET OVER FRAMING AT 24" 6' 0" MINIMUM LAP NOTES: <br /> / O.C. <br /> 1. TOP PLATE SPLICE <br /> 3 2. WALL TOP PLATE (1) OVER STUD ONLY. <br /> 2. PLYWOOD SHEATHING ( ) <br /> • <br /> • 2. WOOD TRUSS PER PLAN BELOW 16d NAILS @ 4" O.C. cp <br /> I / <br /> ��� 3. EDGE NAILING7yr _ 3. PLYWOOD SHEATHING (2) 3. LINE OF PLYWOOD SHEATHING JOINTS 2. DOUBLE TOP PLATE. co <br /> ��, 4. GIRDER TRUSS BEYOND / 1 � T - <br /> �� (1) 4. 2x BLOCKING WITH (3) 16d NAILS v (3) 3. WOOD STUDS. <br /> , ��,- PEP. BLOCK (1) 1 4. 2x8 LAYED FLAT OVER PLYWOOD SHEATHING <br /> � � � (2) 5. SIMPSON DSC4 DRAG STRUT WITH (3) 16d NAILS TYPICAL AT EACH TRUSS (2) <br /> -- � (3) 5. WOOD FASCIA WITH (2) 10d A \, CONNECTOR EACH END W '/ . <br /> 2 �/ (4) \ 5. SIMPSON A34 OR (2) 16d TOENAILS (3) ® t� <br /> �� NAILS PER TRUSS MANUFACTURER O <br /> (8) (4) / \ \ 6. GIRDER TRUSS BOTTOM CHORD 5 (4) /� 5 NOTES: 0 <br /> as Et <br /> \:\1 <br /> � � (5) 6. SHEATHING AND ATTACHMENT PER (5) x . <br /> (1) A. PLYWOOD SHEATHING ON PRIMARY ROOF <br /> SHEARWALL SCHEDULE �I CD Li <br /> rono l - TRUSSES SHALL BE CONTINUOUS. <br /> (7) 7. SIMPSON H1 AT EACH TRUSS (5) / if <br /> (3) USE SIMPSON H2.5 EACH SIDE (6) / B. FOR CLARITY, SHEATHING OVER VALLEY •� 0 <br /> (6) OF GIRDER TRUSS FRAMING NOT SHOWN. Cr5 ® 1-0 <br /> 8. SIMPSON A35 CLIP AT 24" O.C. C. AT 2x OVER FRAMING USE THE FOLLOWING: C Ix <br /> 0'-4' 2x4 MIN. = U Ca <br /> 4'-8' 2x6 MIN. c 04 a <br /> 8'-10' 2x8 MIN, ‘35CO <br /> T I 10' 12' 2x10 MIN, CO Li N <br /> WOOD TRUSS AT WOOD STUDWALL C_) DRAG TRUT 0 PLAN-TYPICAL VALLEY FRAMING AT PREFAB TRUSSES 0 I TYPICAL SPLICEOF TOP PLATES <br /> SCALE: N.T.S. SCALE: N.T.S. SCALE: N.T.S. ) SCALE: N.T.S. <br /> - - NOTES: ._ <br /> (1) NOTES: HEADER AND BEAM SCHEDULE FOR LOAD BEARING WALLS 1. 1/4 DEPTH OF MEMBER, TYPICAL A-; ,, Y : <br /> CV I it ------ - - - --- --- 12>> (1) �'(>-�,. r `'� <br /> ° . � ;- <br /> (2) 1. WOOD STUD WALL TRIMMERS REQ'D KING STUDS REQ'D (2) 2. 1/2" DIAMETER BOLTS AT 24" _ <br /> OPENING SIZE HEADER SIZE -- r er_ <br /> ,� (3) 2. WOOD HEADER PER PLAN ® ® O.C. MINIMUM, STAGGERED <br /> 2X4 2X6 2X4 2X6 " , c <br /> 3. (2) 16d TOENAILS - EACH UP TO 3'-6" SEE PLAN 1 1 1 1 3. (2) 2x12 AND LARGER USE 1/2" 7 4s \� a� <br /> ` (4) SIDE, EACH END ® ® DIAMETER BOLTS AT 24" O.C. � , <br /> T 3'-6"> TO 5'-0" SEE PLAN -i 1 2 2 2 4. 16d NAIL AT 12" O.C. MINIMUM, <br /> (5) 4. (3) 16d NAILS AS SHOWN °\ STAGGERED <br /> 5'-0"> TO 8'-0" SEE PLAN 1 2 2 2 OPTION 1 (3) <br /> 5. RUN VERTICAL STUDS UP -- - - - - -- - <br /> 5. (2) 2x10 AND SMALLER USE 16d <br /> (6) PAST HEADER AS SHOWN 8'-0"> TO 10'-6" SEE PLAN 2 3 3 3 6" (1) NAILS AT 12" O.C. STAGGERED <br /> E- (8) 6. (2) 16d NAILS AT 12" D.C. 10'-6"> TO 16'-0" SEE PLAN 3 _ 4 3 3 1 (4) <br /> NOTES: <br /> 1 I o o A. ATTACHMENT (BOLTS OR NAILS) <br /> CONTINUOUS FOR LENGTH OF <br /> 8. DOUBLE STUDS UNDER NOTES: MEMBER. <br /> iI /� HEADER BEARINGS FOR o 0 <br /> �/ OPENING WIDTHS GREATER - UNLESS NOTED OTHERWISE, ALL BEAM AND HEADER SUPPORTS SHALL CONFORM TO THIS SCHEDULE <br /> ROUGH OPENING WIDTH THAN 5'-0" - ALL BUILT-UP SUPPORTS WILL MATCH OR EXCEED WIDTH OF SUPPORTED BEAM <br /> / - ALL HEADERS ARE TO BE 4X10 DF-L NO.2 UNLESS NOTED OTHERWISE OPTION 2 (5) <br /> 7--- WOOD HEADER (DROPPED) HEADER AND BEAMSCHEDULE FOR LOAD A ING WALLS BUILT-UP <br /> SCALE. N.T.S. SCALE: N.T.S. 0 SCALE: N.T.S. <br /> NOTE: <br /> LOCATE HDR @ TOP OF WALL OR © TOP NO HORIZ PW NOTE: <br /> OF OPENING @ CONTRACTOR'S OPTION JOINTS FOR PROVIDE FULL BEARING UNDER GIRDER TRUSSES. <br /> UNLESS INDICATED OTHERWISE BY LENGTH OF MIN. (3) 2X6 STUDS BUILT UP COLUMN <br /> LOCATION OF HDR'S WHERE REQ'D. ARCHITECT OR ENGINEER. STRAP <br /> © UNDERSIDE OF TOP R - SEE NOTE <br /> (4) FOR HDR SIZE UNLESS NOTED (2) 16d INTO EACH STUD © TOP <br /> OTHERWISE ON FLOOR PLAN. & BOTTOM. P (4) 16d INTO CI <br /> E SOLID WOOD COL. 2X6 BLKG. S-=A WALL SC--DUL= <br /> SIMPSON MST 48 @ JOINT FULL LENGTH <br /> (2) 16d <br /> IN WALL INSTALL STRAP BEHIND STRAP. <br /> OVER WALL SHEATHING TYP. SIMPSON MST 48 © CHANGE FRAMING AT FOUNDATION SILL <br /> IN WALL P kEIGHT. INSTALL WALL PANEL EDGE FIELD BASE PLATE ANCHOR BOLT BLOCKING/RIM e� <br /> SHEATHING SIDES ADJACENT PANEL PLATE/FLOOR BASE 2 <br /> MARK NAILING NAILING ATTACHMENT SPACING JOIST ATTACHMENT <br /> -- - -- EDGES PLATE EtC\I <br /> I �f 8d NAILS 16d NAILS AT 5/8" DIAMETER BOLTS SIMPSON A35 CLIPS <br /> I t �(2) 16d 1 (2) 16d <br /> ITSW1 7/16" OSB ONE AT 6" O.C. 12 O.C. 2x 6" O.C. AT 48" O.C. 2x AT 18" O.C. <br /> hI TOENAILS TOENAILS <br /> (3) 16d ' @ CTR FULL TYP, I I I EQ. EQ. <br /> (3) STUD B.U. COL. TYP. HEIGHT / \_I _1 0 <br /> TYP U.N.O. W/(1) STUD COe, r-.4\FULL HOT.LL STUDHDR CONN. TO S-EAR WALL SCHEDULE NOTES: CO W <br /> TO W SIZE PL. SEE (1) HORIZ FACE OF COL. <br /> PLAN <br /> FULL WIDTH 2x STUDS FRAMING STUDS SHALL BE DOUGLAS-FIR #2 SPACED AT 16" O.C. MAXIMUM. THICKNESS OF STUDS SHALL BE 2x UNLESS OTHERWISE NOTED IN SCHEDULE. <br /> STUDS REQ'D STUDS TO <br /> -LAM W/16d @ I I MATCH WALL SEE PLAN FOR SIZE <br /> 8" O.C. TYP. BUILT UP COL. OR I -LOCATE STUDS @ JOIST <br /> STUDS © TOP � SHEATHING PANELS MAY BE PLACED VERTICAL OR HORIZONTAL. BLOCK ALL HORIZONTAL EDGES WITH 2x OR 3x BLOCKING TO MATCH STUD WIDTH UNLESS NOTED OTHERWISE. <br /> & BOTT. OF SOLID WOOD & TRUSS BRG. (TYP.) i <br /> COL. SEE CO <br /> ADDITIONAL OPNGS. PLAN ALL EXTERIOR WALLS NOT DESIGNATED AS SHEARWALLS SHALL RECEIVE APA RATED SHEATHING, FULLY BLOCKED WITH MINIMUM EDGE ATTACHMENT OF 10d NAILS @ 6" O.C., 12" O.C. FIELD. o <br /> CZ <br /> STUD @ HDR ( / 1 - <br /> 165 <br /> SIMPSON A35 BRG. WHERE I NAILING APPLIES TO ALL STUDS, TOP AND BOTTOM PLATES AND BLOCKING. <br /> @ EA. B.U. COL. MORE THAN <br /> WHERE OPENING (3) B.U. STUDS <br /> WIDTH EXCEEDS REQ'D I I MIN STUDS DA MINIMUM ANCHOR BOLT SPACING OF 48" O.C. UNLESS OTHERWISE NOTED IN SCHEDULE. MINIMUM OF 2 ANCHORS PER WALL. PROVIDE 3"x3"x0.25" SQUARE WASHERS AT EACH ANCHOR <br /> 8'-0" I i BETWEEN THE SILL PLATE AND WASHER. A DIAGONAL SLOT IN THE PLATE WASHER MAY BE USED WITH A WIDTH OF UP TO 3/16" LARGER THAN THE BOLT DIAMETER AND A SLOT NOT TO <br /> (2) 16d I <br /> TOENAILS EXCEED 1-3/4", PROVIDED A STANDARD CUT WASHER IS PLACED BETWEEN THE PLATE WASHER AND THE NUT. DO NOT RECESS BOLTS. - <br /> TTP. 1Tj <br /> CZ <br /> Ili 1=1= 4=11 1 _ 1-11 1 f 1' 1t 8d NAILS (2 1/2" LONG x 0.113" COMMON OR 2 1/2" x 0.113" GALVANIZED BOX). Li- <br /> / 1 <br /> BLOCKING/RIM JOIST ATTACHMENT NEED NOT BE USED WHERE THE SHEATHING IS DIRECTLY ATTACHED WITH EDGE NAILING TO THE DOUBLE TOP PLATES AT UPPER STORY SHEARWALLS AND 3� <br /> OMIT BOTT. P- SIMPSON HD WHERE TO THE BASE/SILL PLATE BELOW AT LOWER STORY SHEARWALLS. <br /> @ DOORS TYP. REQ'D. SEE PLANS FOR <br /> SX TREATED P TO FOR SHEARWALL SCHEDULE, SIZE. <br /> MATCH WALL STUD A.B. SIZE & SPACING WHERE 3x BASE/SILL ARE SPECIFIED, 20d COMMON NAILS SHALL BE USED FOR THE BASE PLATE ATTACHMENT IN LIEU OF THE ORIGINALLY SPECIFIED 16d COMMON NAILS. <br /> WIDTH. (7" MIN. EMBED) CO <br /> 0 <br /> TYPICAL EXTERIORINTERIOR BEARING ALL FRAMING SHEARWALL C UL <br /> 8 SCALE: N.T.S. "• - <br /> SCALE: N.T.S. <br /> I <br /> w <br /> 1- <br /> w <br /> a <br /> C;. <br /> UJ ea" <br /> ® 1 M <br /> SHEET <br /> ® 1, <br />