Laserfiche WebLink
r Date J/may <br />APPlicatior, For <br />PUBLIC WORKS PERMIT <br />Print or Type Only <br />Address <br />Describe Proposed Work <br />Public Warta Per e O <br />Bldg. Dept a V <br />Public ftoo Pea <br />Tgtal Fee S <br />Lee, April Fee Paid S <br />Balance Duo >< <br />Phone <br />-3 <br />1 <br />Project Address (If knuwn) -2ya?!� r 1'e� W <br />ar-1 <br />Attach four (4) copies of plans for proposed work - Draw to scale and note the following as applicable: <br />• Property Lines <br />0 Outline and dimensions of all existing and 0 Centerline of street <br />proposed structures on the lot 0 Indicate North <br />• Existing and proposed utilities � Show any proposed grading changes M� <br />r ci-:. • Show measurements <br />PERMIT CONDITIONS <br />DO NOT WRITE BELOW THIS LINE m <br />Q1. All calls for inspection shall be made 24 his. in advance - phone 259-881 5. <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1.800-424-5555. <br />0 <br />C e - <br />1 <br />3 ir��r a <br />Approved for Construction <br />Date <br />FINAL INSPECTION <br />Approved as Constructed Date <br />everelt PUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />Everett, WA 98201 <br />Phone: 259.8815 <br />L <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and save harm- <br />less the City of Everett from any and all claims for damages, costs, <br />expenses, or causes of action that may arise because of installation <br />and maintenance of the improvement or other right-of-way use hereto <br />applied for and further agrees to remove same upon notice from the <br />City and to replace public property damaged thereby. <br />Signature of gpphcant <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED Date <br />180 DAYS OF DATE WITHIN <br />ISSUED ANIS TO <br />BE DILIGENTLY PURSUED M TO IT ICOMPLETION .DTH SEREAFTER PEMAY RE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS ..I <br />PROJECT OVER 90 DAYS DURATION. <br />I <br />I <br />