Laserfiche WebLink
Itemized Quote <br /> Date:05/26/2021 Organization: PlayCreation, Inc. Drawing No: 1762289 -3 <br /> By:John Larson Contact:JohnL@PlayCreation.com 1206.940.1108 <br /> Project: Howarth Park-Concept 2 Design A- Rev. 1 Location: Everett,WA <br /> SUMMARY CONCRETE FOOTINGS LABOR WEIGHT PRICE <br /> (cu-ft) (count) (man-hours) (lb) (2021) <br /> PlayBooster® (2-5 years) PHASE-1 36.7 14 21.8 2,590.0 18,515.00 <br /> Total Safety Zone Area =2035 sq.ft. <br /> PlayBooster® (5-12 years) PHASE-1 86.8 32 2.8 3,494.0 41,025.00 <br /> Total Safety Zone Area =2035 sq.ft. <br /> ALL PHASES PlayBooster® 86.7 30 5.5 3,591.0 46,370.00 <br /> Freestanding Play 36.8 16 19.0 2,493.0 13,170.00 <br /> Total 123.5 46 24.5 6,084.0 59,540.00 <br /> Page 2 of 2 <br />