My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2506 BAKER AVE 2022-01-19
>
Address Records
>
BAKER AVE
>
2506
>
2506 BAKER AVE 2022-01-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2022 9:33:13 AM
Creation date
8/16/2021 8:10:46 AM
Metadata
Fields
Template:
Address Document
Street Name
BAKER AVE
Street Number
2506
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Intake & Approval Sheet (FOR PERMIT STAFF ONLr PERMIT # ?)200(S <br />BUILDING <br />Intake OK by: Date: <br />Intake Comments: <br />❑ Route to Commercial Building <br />❑ Route to Residential Building <br />❑ Make this a "W" Permit <br />Bldg/TI/Addn/Rem Size <br />AIIIA <br />Garage/Accessory Struct. Size <br />L0-8 TF <br />Number of Stories <br />Basement <br />IRNo ❑Yes , Fin / Unfin <br />Type of Construction <br /> <br />Occupancy Group <br />` 3 <br />Occupancy Load <br />Z <br />Fire Sprinklers: ❑Update Existing ❑New System ®Not Req'd <br />Reason Sprinklers Required: <br />Fire Alarm: ❑Update Existing ❑New System LJNot Req'd <br />Reason Fire Alarm Required: <br />RCW 64.55 MF worksheet req'd for permit? ❑Yes allo <br />Add'I RCW 64.55 docs required prior to final? ❑Yes No <br />VALUATION CALCULATION: Total $ 4/ U 00 F <br />Additional Notes: <br />Approved By • Date: O-7 aJ.15040 <br />FIRE DEPARTMENT <br />Separate / Deferred Submittals Required: <br />El Fire Sprinklers ❑Fire Alarm []Other: <br />Additional Notes: <br />Fire Dept. Fees: <br />❑ Review of As -Built Plans - NO FIRE FEE <br />❑ Minimal or No Fire Scope - NO FIRE FEE <br />❑ Review / Inspection Scope - ADD FIRE FEE <br />Approved By: Date: <br />ELECTRICAL <br />Additional Notes: <br />Approved By: Date: <br />PLANNING <br />Intake OK by: Assign To: Date: <br />Intake Comments: <br />❑ Attach to Project No. <br />❑ Route to Historic Reviewer <br />ElOK to Route to Other Departments <br />❑ Hold in Planning File Drawer <br />Zone <br />Overlay/Agreement <br />Nonresidential Use <br />Residential Use <br />Proposed No. of Dwelling Units: <br />Total No. of Dwelling Units: <br />Planning/Landscape Inspection Required before Final? ❑Yes No <br />"In Lieu" Fee: Type: Amount $ <br />School Impact Fee: Total $ <br />Calculated: Credit: <br />El Everett School Dist ❑Mukilteo School Dist <br />Additional Notes: <br />Approved Date: �- <br />PUBLIC WORKS <br />Intake OK by: Date: <br />.... <br />Intake Comments: <br />PW Worksheet Needed if. :................... ........... ............... <br />El Sys Dev Eva ❑Traffic Mit Eval <br />❑Site Work or Drainage Proposed <br />❑Backfiow Prevention for high hazard: <br />'(dental, medical, animals, mortuary, hospital, <br />.supportive housing) <br />. ...... .... ..... ..... . .... ...... . ..... ........... ..... ........... ..... ...... .... ............ ...... ....... .. ... <br />❑ Route this folder for PW Review at end --- PW Review Worksheet <br />❑This project also has a separate concurrent PW Review (Green Folder) <br />AND ❑Create Green Folder ❑Submitted Previously ❑Deferred <br />This Permit is Approved by Public Works <br />See PW Review Worksheet and associated attached items <br />❑ A Separate PW Permit is Required (Permit #: PW ) <br />AND ❑ Is located in this folder <br />❑ Is in a Separate Green Folder Qoin with this folderfor permit issuance) <br />❑ Will be issued separately (Separate Green Folder, PW issued ahead of Bldg) <br />❑ Public Works has no scope --- PW Not Required <br />Additional Notes: <br />Approved BT-7 Date: <<, 2, Z, <br />
The URL can be used to link to this page
Your browser does not support the video tag.