My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1622 E MARINE VIEW DR 2018 Plans 2022-12-27 (3)
>
Address Records
>
E MARINE VIEW DR
>
1622
>
Plans
>
1622 E MARINE VIEW DR 2018 Plans 2022-12-27 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2022 4:06:38 PM
Creation date
8/16/2021 8:44:03 AM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
1622
Permit
B1812-036
Year
2018
Notes
NEW MAIL KIOSK FOR NEW APT COMPLEX
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0. <br /> LO <br /> f7U <br /> <11> <br /> ,, <br /> JOHNSON B .UNDINC <br /> E)0,1 <br /> Lo <br /> 15200 52nd Ave. South <br /> N <br /> Suite 300 <br /> Seattle, WA 98188 <br /> Phone 206.766.8300 <br /> www.johnsonbraund.com <br /> ARCHITECTURE <br /> INTERIOR DESIGN <br /> Greg L.Allwine,AIA <br /> Jeffrey A.Williams,AIA <br /> PORTER <br /> SfEATHING PER PLAN NOTE 1 JOISTS PER PLAN NOTE 2 �L �► ��� S9 L E <br /> INSTALL ECC SERIES i - _ <br /> POST CAPS, TYPICAL <br /> \ 4: <br /> 1, ROOF SHEATHING SHALL 3/4" PLYY'IOOD (PANEL SPAN RATING 32/16). 801 SECOND AVENUE-SUITE 900 <br /> NAIL SHEATHING AT ALL FRAMED PANEL EDGES, DIAPHRAGM <br /> BOUNDARIES, STRUTS, BLOCKING, AND SHEAR MALLS BELOW Yd/ 10c P: 06/343a0460 <br /> F: 206/343-569 <br /> GL 63/4x12 6"��. NAIL SHEATHING AT ALL INTERMEDIATE SUPPORTS W/ 1®d 12"� , SEATTLE,WA 91 104 <br /> GL 63/4x12 — J GL 63/4x12 U.O.N. INSTALL PANEL EDGE CLIPS PER GENERAL STRUCTURAL NOTES A CONSULTING <br /> AT ALL UNFRAMED, UNBLOCKED PANEL EDGES. STRUCTURAL AND NIL <br /> �, ENGINEERING CORPORATION <br /> s GL 63/�x12 RIDGE I-� - — — - <br /> l . _ _ A �� L 2. ROOF FRAMING SHALL BE 2x6 HEM-FIR `� RAFTERS 24"oc. <br /> PT 6x6 KING POST 16 PT 6x6 KING POST ? <br /> /1-,---, GL 63/�x12Y �Asi A <br /> 56.01.N- <br /> 4- LEGEND: <br /> 0 :LI 4 f ;ter ift <br /> INSTALL ECG SERIES <br /> POST CAP AT TOP 4 y <br /> POST BELOW ° :Y' <br /> ( ` �s. <br /> SOT. OF KING POST ��rm�� y , �,� <br /> 4----, SPAN DIRECTION OF JOISTS <br /> 0 <br /> MAIL IOSK ® ROOF F _ ING PLAN <br /> 3/8" 1'-0" <br /> PLAN NOTES: <br /> 1. SLAB-ON-GRADE SHALL BE 4" THIC<, U.O.N. PROVIDE 10 MIL VAPOR BARRIER BELOW SLAB AT <br /> INTERIOR SPACES OVER 4" FREE-DRAINING GRANULAR FILL PER GEOTECHNICAL REPORT. i <br /> SEE ARCHITECTURAL DRAWINGS FOR SLAB DEPRESSION AND SLOPE REQUIREMENTS. ICU DATE: Issue Date <br /> 2. PROVIDE CONSTRUCTION/CONTROL .OINTS IN SLABS ON GRADE TO DIVIDE SLAB INTO <br /> RECTANGULAR AREAS 144 SQUARE FEET OR LESS. AREAS SHALL BE APPROXIMATELY SQUARE <br /> AND HAVE NO ACUTE ANGLES. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. JOINT <br /> LOCATIONS MUST BE APPROVED BY THE ARCHITECT. SEE 5/53.01 . <br /> S. TOPS OF ALL EXTERIOR FOOTINGS ON THIS PLAN SHALL BE BURIED BELOW FINISHED GRADE <br /> AS SHOWN IN DETAIL 20/55,02, U.O.N. OVER EXCAVATE AND PLACE SUITABLE COMPACTED FILL <br /> AS DIRECTED BY OWNER APPROVED GEOTECHNICAL ENGINEER WHERE REQUIRED. CO <br /> kai- <br /> ka ,o� CONTRACTOR SHALL COORDINATE WITH FINAL SITE GRADES AND MAINTAIN MINIMUM DEPTH OF 0 <br /> \✓ 2� ilstQ4 FOOTINGS SHOWN ON THE DRAWIdGS. SEE 10/55.01 FOR STEPS IN FOOTING, WHERE REQUIRED. <br /> 4. SEE ARCHITECTURAL/MEGHANICAL/CIVIL/UTILITIES DRAWINGS FOR UNDERSLAB PIPING. <br /> COORDINATE FOUNDATION DEPTHS AND PIPING IN ACCORDANCE WITH 14/55.01. <br /> C <br /> w <br /> 0 <br /> - INSTALL ABUSE POST <br /> CO0 co <br /> 5 BASE TO TOP OF SLAB, <br /> colTYPICAL <br /> oo <br /> b <br /> 46 em 0 0 , Oi-o3 , <br /> 40 <br /> ip <br /> a z m ® rt04 <br /> FOOTING MAR< PER 20/55.01 <br /> ® AIL KIOSK ® FOU 3 t` DAT�ION/FLOOR F M I NG PLAN <br /> D POST THIS LEVEL PROJECT 4: S182046-03 0-5 <br /> 3/8"= 1°-0" DRAWN BY: JAT <br /> T <br /> CHECKED BY: GIMP <br /> o <br /> MAIL KIOSK <br /> CD <br /> FOUNDATION o <br /> ix FRAMING PLANS <br /> Ci <br /> 6 <br /> w <br /> PERMIT 9/28/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.