|
Intake & Approval Sheet (FOR PERMIT STAFF ONLY) PERMIT # � .X3
<br />BUILDING
<br />Intake OK by: Date:
<br />Intake Comments:
<br />❑ Route to Commercial Building
<br />❑ Route to Residential Building
<br />❑ Make this a "W" Permit
<br />Bldg/TI/Addn/Rem Size
<br />Garage/Accessory Struct. Size
<br />Number of Stories
<br />2.
<br />Basement
<br />JNNo ❑Yes , Fin / Unfn
<br />Type of Construction
<br />Occupancy Group
<br />Occupancy Load
<br />Fire Sprinklers: []Update Existing ❑New System ❑Not Req'd
<br />Reason Sprinklers Required:
<br />Fire Alarm: El Update Existing El New System ❑Not Req'd
<br />Reason Fire Alarm Required:
<br />RCW 64.55 MF worksheet req'd for permit? ❑Yes® No
<br />Add'I RCW 64.55 docs required prior to final? ❑Yes 19No
<br />VALUATION CALCULATION: Total $ Z31 0-'x1
<br />Additional Notes: Z;j/S
<br />Approved By: Date: Wz,1,,
<br />FIRE DEPARTMENT
<br />Separate / Deferred Submittals Required:
<br />❑Fire Sprinklers ❑Fire Alarm ❑Other:
<br />Additional Notes:
<br />Fire Dept. Fees:
<br />❑ Review of As -Built Plans - NO FIRE FEE
<br />❑ Minimal or No Fire Scope - NO FIRE FEE
<br />❑ Review / Inspection Scope - ADD FIRE FEE
<br />Approved By: Date:
<br />ELECTRICAL
<br />Additional Notes:
<br />Approved By: Date:
<br />PLANNING
<br />Intake OK by: Assign To:
<br />Intake Comments:
<br />❑ Attach to Project No.
<br />❑ Route to Historic Reviewer
<br />ElOK to Route to Other Departments
<br />❑ Hold in Planning File Drawer
<br />Date:
<br />Zone
<br />Overlay/Agreement
<br />Nonresidential Use
<br />Residential Use
<br />S
<br />Proposed No. of Dwelling Units:
<br />Total No. of Dwelling Units:
<br />Q3q\
<br />Planning/Landscape Inspection Required before Final? ❑Yes ❑No
<br />"In Lieu" Fee: Type:
<br />Amount
<br />School Impact Fee: Total $
<br />Calculated: Credit:
<br />El Everett School Dist ElMukilteo School Dist
<br />Additional Notes:
<br />Approved Br---
<br />Date: 2.o u�
<br />PUBLIC WORKS
<br />Intake OK by: Date:
<br />...................................................................................................
<br />Intake Comments: !PW Worksheet Needed if.,
<br />❑Sys Dev Eva []Traffic Mit Eval
<br />[]Site Work or Drainage Proposed
<br />❑Backflow Prevention for high hazard:
<br />!(dental, medical, animals, mortuary, hospital,
<br />;supportive housing)
<br />s.... ......... ....... ...... ..... ,,,,,.,,,,.,,,,.,,,,,.,,,,.,,,,.,.,,,.,,,,.,,,,,.,,,,...... ,,,,..,,,,............ ..... ...... ..... .... ......
<br />❑ Route this folder for PW Review at end --- PW Review Worksheet
<br />❑This project also has a separate concurrent PW Review (Green Folder)
<br />AND ❑Create Green Folder []Submitted Previously ❑Deferred
<br />❑ This Permit is Approved by Public Works
<br />❑ See PW Review Worksheet and associated attached items
<br />❑ A Separate PW Permit is Required (Permit #: PW )
<br />AND ❑ Is located in this folder
<br />❑ Is in a Separate Green Folder (join with this folder for permit issuance)
<br />❑ Will be Issued separately (Separate Green Folder, PW issued ahead of Bldg)
<br />D.Public Works has no scope --- PW t Required
<br />Additional Not 'C' 4-ft-re, I -Le -7—
<br />Approved By: Date:
<br />qZ
<br />
|