Laserfiche WebLink
Intake & Approval Sheet (FOR PERMIT STAFF ONLY) PERMIT # � .X3 <br />BUILDING <br />Intake OK by: Date: <br />Intake Comments: <br />❑ Route to Commercial Building <br />❑ Route to Residential Building <br />❑ Make this a "W" Permit <br />Bldg/TI/Addn/Rem Size <br />Garage/Accessory Struct. Size <br />Number of Stories <br />2. <br />Basement <br />JNNo ❑Yes , Fin / Unfn <br />Type of Construction <br />Occupancy Group <br />Occupancy Load <br />Fire Sprinklers: []Update Existing ❑New System ❑Not Req'd <br />Reason Sprinklers Required: <br />Fire Alarm: El Update Existing El New System ❑Not Req'd <br />Reason Fire Alarm Required: <br />RCW 64.55 MF worksheet req'd for permit? ❑Yes® No <br />Add'I RCW 64.55 docs required prior to final? ❑Yes 19No <br />VALUATION CALCULATION: Total $ Z31 0-'x1 <br />Additional Notes: Z;j/S <br />Approved By: Date: Wz,1,, <br />FIRE DEPARTMENT <br />Separate / Deferred Submittals Required: <br />❑Fire Sprinklers ❑Fire Alarm ❑Other: <br />Additional Notes: <br />Fire Dept. Fees: <br />❑ Review of As -Built Plans - NO FIRE FEE <br />❑ Minimal or No Fire Scope - NO FIRE FEE <br />❑ Review / Inspection Scope - ADD FIRE FEE <br />Approved By: Date: <br />ELECTRICAL <br />Additional Notes: <br />Approved By: Date: <br />PLANNING <br />Intake OK by: Assign To: <br />Intake Comments: <br />❑ Attach to Project No. <br />❑ Route to Historic Reviewer <br />ElOK to Route to Other Departments <br />❑ Hold in Planning File Drawer <br />Date: <br />Zone <br />Overlay/Agreement <br />Nonresidential Use <br />Residential Use <br />S <br />Proposed No. of Dwelling Units: <br />Total No. of Dwelling Units: <br />Q3q\ <br />Planning/Landscape Inspection Required before Final? ❑Yes ❑No <br />"In Lieu" Fee: Type: <br />Amount <br />School Impact Fee: Total $ <br />Calculated: Credit: <br />El Everett School Dist ElMukilteo School Dist <br />Additional Notes: <br />Approved Br--- <br />Date: 2.o u� <br />PUBLIC WORKS <br />Intake OK by: Date: <br />................................................................................................... <br />Intake Comments: !PW Worksheet Needed if., <br />❑Sys Dev Eva []Traffic Mit Eval <br />[]Site Work or Drainage Proposed <br />❑Backflow Prevention for high hazard: <br />!(dental, medical, animals, mortuary, hospital, <br />;supportive housing) <br />s.... ......... ....... ...... ..... ,,,,,.,,,,.,,,,.,,,,,.,,,,.,,,,.,.,,,.,,,,.,,,,,.,,,,...... ,,,,..,,,,............ ..... ...... ..... .... ...... <br />❑ Route this folder for PW Review at end --- PW Review Worksheet <br />❑This project also has a separate concurrent PW Review (Green Folder) <br />AND ❑Create Green Folder []Submitted Previously ❑Deferred <br />❑ This Permit is Approved by Public Works <br />❑ See PW Review Worksheet and associated attached items <br />❑ A Separate PW Permit is Required (Permit #: PW ) <br />AND ❑ Is located in this folder <br />❑ Is in a Separate Green Folder (join with this folder for permit issuance) <br />❑ Will be Issued separately (Separate Green Folder, PW issued ahead of Bldg) <br />D.Public Works has no scope --- PW t Required <br />Additional Not 'C' 4-ft-re, I -Le -7— <br />Approved By: Date: <br />qZ <br />