Laserfiche WebLink
Intake & Approval Sheet (FOR PERMIT STAFF ONLY) <br />PERMIT #. <br />P�'Za-4-o3s <br />BUILDING <br />Intake OK by: Date: <br />Intake Comments: <br />❑ Route to Commercial Building <br />❑ Route to Residential Building <br />❑ Make this a "W" Permit <br />Bldg/TI/Addn/Rem Size <br />225F/ <br />Garage/Accessory Struct. Size <br />i <br />Number of Stories <br />;1 / r 0(-7 <br />Basement <br />[]No ❑Yes , Fin / Unfin <br />Type of Construction <br />V % - <br />Occupancy Group <br />— <br />Occupancy Load <br />Fire Sprinklers: ❑Update Existing ❑New System MNot Req'd <br />Reason Sprinklers Required: <br />Fire Alarm: ❑Update Existing ❑New System Mot Req'd <br />Reason Fire Alarm Required: <br />RCW 64.55 MF worksheet req'd for permit? ❑Yes M No <br />Add'I RCW 64.55 docs required prior to final? ❑Yes f3No <br />VALUATION CALCULATION: Total $ <br />Additional Notes: <br />Approved By:>S— Date: <br />FIRE DEPARTMENT <br />Separate / Deferred Submittals Required: <br />El Fire Sprinklers ❑Fire Alarm ❑Other: <br />Additional Notes: <br />Fire Dept. Fees: <br />❑ Review of As -Built Plans - NO FIRE FEE <br />❑ Minimal or No Fire Scope - NO FIRE FEE <br />teview / Inspection Scope -ADD FIRE FEE <br />oved By: Date: G — <br />ELECTRICAL' <br />Additional Notes: <br />Approved By: Date: <br />PLANNING <br />Intake OK by: Assign To: Date: <br />Intake Comments: <br />❑ Attach to Project No. <br />❑ Route to Historic Reviewer <br />❑ OK to Route to Other Departments <br />❑ Hold in Planning File Drawer <br />Zone <br />J <br />Overlay/Agreement <br />Nonresidential Use <br />Residential Use <br />Proposed No. of Dwelling Units: <br />Total No. of Dwelling Units: <br />Planning/Landscape Inspection Required before Final? ❑Yes No <br />"In Lieu" Fee: Type: Amount $ <br />School Impact Fee: Total $ <br />Calculated: Credit: <br />❑Everett School Dist ❑Mukilteo School Dist <br />Additional Notes: <br />Approved By: /�25 Date: <br />PUBLIC WORKS <br />Intake OK by: Date: <br />....,,............................................................,,.,..,...,,.......,,,....,,,...,,,...,,,,,,,................................ <br />Intake Comments: `PW Worksheet Needed if. <br />❑Sys Dev Eval ❑Traffic Mit Eval <br />❑Site Work or Drainage Proposed <br />❑Backflow Prevention for high hazard: <br />:(dental, medical, animals, mortuary, hospital, <br />:supportive housing) <br />1,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,.,,...,,,,,.,,.,.,,,...,,,...,,,...,..,,,....,,,...,,,...,,,,,,.......*.............,,......... <br />El Route this folder for PW Review at end --- PW Review Worksheet <br />❑This project also has a separate concurrent PW Review (Green Folder) <br />AND ❑Create Green Folder ❑Submitted Previously ❑Deferred <br />❑ This Permit is Approved by Public Works <br />❑ See PW Review Worksheet and associated attached items <br />❑ A Separate PW Permit is Required (Permit #: PW ) <br />AND ❑ Is located in this folder <br />❑ Is in a Separate Green Folder (oin with this folder for permit issuance) <br />❑ WIII be Issued separately (Separate Green Folder, PW issued ahead of Bldg) <br />❑ Public Works has no scope --- PW Not Required <br />Additional Notes: <br />Approved By: Date: <br />