My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1205 CRAFTSMAN WAY HERITAGE MARINE ELECTRICAL 2022-01-14
>
Address Records
>
CRAFTSMAN WAY
>
1205
>
HERITAGE MARINE ELECTRICAL
>
1205 CRAFTSMAN WAY HERITAGE MARINE ELECTRICAL 2022-01-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2022 8:20:02 AM
Creation date
8/16/2021 1:08:06 PM
Metadata
Fields
Template:
Address Document
Street Name
CRAFTSMAN WAY
Street Number
1205
Tenant Name
HERITAGE MARINE ELECTRICAL
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION ONE - INTRODUCTION <br />Now, THEREFORE, the parties herein do mutually agree as follows: <br />The City hereby adopts this Agreement in conjunction with the rezone of the Property described in <br />Section Two of this Agreement to a PDO in accordance with provisions of Chapter 19.29 and <br />19.41.160 of the Everett Municipal Code. This Agreement supersedes and replaces the 2005 <br />Development Agreement and any; other development agreement between the Port and City relating <br />to the Property. <br />The City and the Port agree that the purpose of this Agreement is to comply with the Everett <br />Municipal Code and the Conditions of Approval for the PDO-WC Rezone. The City and the Port <br />further agree that this Agreement establishes certain rights of the Port to develop the Property in <br />accordance with the conditions specified herein. Provided, however, that additional SEPA review, <br />and issuance of appropriate City approvals and permits are required as set forth below. <br />The City and the Port agree that each has entered into this Agreement knowingly and voluntarily and <br />agree to be bound by its terms and conditions. <br />It is the intent of this Agreement that all of the major components of Waterfront Place Central will <br />be completed in several phases beginning in 2014 and continuing to no later than 2034. The City <br />and the Port recognize that phasing and construction time among the different components of the <br />Waterfront Place Central will differ and that various structures and districts will be completed in <br />different years. Nevertheless, the Port shall provide public infrastructure improvements in <br />accordance with Section 4.4 below. <br />SECTION TWO - ACTION PROPOSED DESCRIPTION <br />2.1 PROPOSED ACTION <br />The proposed action is the approval by the City of a revised Planned Development Overlay (PDO) <br />zone for the Property described in Section 2.2 for Waterfront Place Central. The PDO includes this <br />Agreement and its exhibits. <br />The general location of the proposed action is between the Port's existing marina, north of and <br />adjoining the Waterfront — Commercial (W-C) zone boundary and the Jetty Landing Boat launch, <br />and extending west of West Marine View Drive to the Snohomish River Channel. <br />5 1 P a g e <br />
The URL can be used to link to this page
Your browser does not support the video tag.