Laserfiche WebLink
Section <br /># Framing / Rough -in Inspection Complies? <br />Comments/Assumptions <br />& Req.ID <br />C402.5.1 The building envelope contains a <br />❑Complies <br />(FR16]1 continuous air barrier that is sealed in <br />❑Does Not <br />an approved manner and either <br />❑Not Observable <br />constructed or tested in an approved <br />El Not Applicable <br />manner. Air barrier penetrations are <br />sealed in an approved manner. <br />Additional Comments/Assumptions: <br />F 1 j High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) <br />Project Title: Zoom+care Everett, WA Report date: 02 2( 7/20 <br />Data filename: Page 6 of 10 <br />