Laserfiche WebLink
MO�IR SP L 2 <br />no, <br />3 <br />'. <br />Noov 043 <br />SECTION - - - <br />. . - <br />, TOWNSHIP,28N. RANGE 5E 1 wmmpA <br />4ENGINEER <br />SECTION 6 TOWNSHIP 28 RANGE 5 QUARTER NW <br />" 10' �� �. H GHLAND ACRES BLK 000 D-05 LOT 2 CITY EVT SP OMEGA ENGINEERING, INC, <br />, JOSEPH SMEBY�, PE <br />!" UTILITY `\ PFN-1202-m-2009®-001 REC UND AFN 201702215002 BEING <br />ESM'T '- A PTN 16 OF SD PLAT 2707 WETMORE AVE. <br />R=240,0' �1% _ lr EVERETT, WA 98201 <br />_._ .. L = .1 " 425.903.4852 <br />BENCHMARK <br />DATUM ASSUMED 425.259.1958 <br />ffC'sVV?d0009 0/ ' ' <br />° 004 71700001605 <br />INVERT ELEVATION OF SSMH ON EAST DRIVESURVEYOR <br />LYING APPROXIMATELY 175 SOUTH OF NORTH END ASPI LAID SURVEYING PLANNING <br />OF PAVEMENT. <br />5205 S 2ND AVE, SUITE A <br />�. EVERETT, WA 98203 <br />RIM = 424.62' <br />,�2.5 •�' y� ,` i / �� ; i PUBLIC <br />I.E. 404.73 <br />I �. 425,252.1884 <br />.3d <br />E � COV'D � £. DRAINAGE 00471 �00001704 �� <br />SLOB / `� PROP. SFR \ i= ESM'T I I <br />gL <br />DECK <br />�(�lP i ��9 / j �� (2,31.4 5F) �\ E._JIL SITE ADDRESS- 5222 EAST DR. EVERETT, WA 98203DRAWING INDEX <br />PARCEL PLUMBER: 00471700001605 1) COVER, PRELIM. SITE LAYOUT SWPPP <br />0' ROOF° 4 2) TARGETED STORMWATER SITE PLAN <br />✓ ZONING: R-1 <br />OVERHANG �/' <br />SOIL MANAGEMENT PLAN <br />TOPSOIL/STOCK PILE NOTE; <br />PILES ARE TO BE COVERED W/ <br />PLASTIC SHEETING WITHIN 24 HOURS> <br />v <br />cn <br />r <br />Ct9 <br />d�J N <br />U_ d <br />z <br />z <br />00 <br />v] <br />on v, <br />4J <br />aj E v Cl <br />n C7 g Q a� d cr <br />' ` 3) DETAILS CONTRACTOR TO INSTAI L SILT ROVED <br />y \ /APP <br />FENCING WHERE NECESSARY ALONGFf <br />':` <br />I�IAACK BROTHERS INC. PERIIViITER IF VEGETATIVE BUFFER PUSLI�PA�T <br />y \ P. <br />',. 22 87TH AVE NE <br />T PROVIDE ADEQUATE .� "'4_ <br />DOES NO V Y <br />12 %fit �w ,, cn w /� �• MARYSVIL.LE, WA 98270 PROTECTION, <br />Y <br />w w . ()ATE <br />1 y�l� g0 PERMIT <br />CO <br />CITY OF <br />w 0 n � ihia: .r �. \ <br />ui <br />#/ �'� PROP D W <br />J <br />"w ___/ <br />i <br />4C t <br />x` <br />PROP. SPLIT <br />�` STKPI <br />r N 89 °33 21 E 102.76 ' I UTILITY S T s <br />RAIL FENCE _` C <br />TOPSOIL ES0. <br />� �� <br />\� .t 9 <br />�- <br />� <br />I. <br />t <br />qi q <br />SEE NOTE <br />i r <br />oo <br />-y')aMit Servi, :es > <br />{� <br />t , <br />n <br />INSTALL SIFT ,` r <br />00471700001606 �, NE ( ®) e <br />ss\* <br />\�v' ` ,� t.,r�LANDSCAPE iv—P C% z PUBLIC <br />ne I ESM'T Opp DRAINAGE <br />"Ns ti i PUBLIC �—tSgU / N14 CD <br />3 ESa9 T <br />a' - DRAINAGE C INLET 1 <br />i <br />ESM'T ;. i <br />00 <br /># �6 A <br />> I .�� �.. <br />, <br />s <br />J I J <br />• `t t j S F g .,- _ -fix f I L'#o p <br />w <br />f '=` <br />'fit J ? >} titttl e`` �i a'�i ..➢' 3 i , b . �.x € 04 <br />cq <br />J 25' INGRESS, EGRESS <br />l=r UTITIL Y ESM'T <br />t� <br />E2 , <br />r <br />t t <br />ci <br />Alc <br />LA <br />�HORIIZONT�ALSCA�LF� <br />EXISTING SOIL & VEGETATION NOTE <br />THE SOIL ANALYSIS FOR THIS <br />PROJECT FOUND THE EXISTING <br />SOILS TO BE ALDERWOOD GRAVELLY <br />SANDY LOAM, THE SITE IN THE <br />AREA OF DISTURBANCE CURRENTLY <br />CONSISTS OF PASTURE. <br />EXISTING UTILITIES NOTE. <br />EXISTING UTILITIES DESIGNED AND <br />INSTALLED PER MOIR SHORT PLAT, <br />AFN 201702215002. ALL EXISTING <br />UTILITIES HAVE BEEN SURVEYED BY <br />ASPI. CONTRACTOR TO TIE .INTO <br />EXISTING WATER AND SEWER STUB <br />ON SITE, <br />NOTE. <br />TOPOGRAPHIC CONTOURS ARE <br />BASED. ON INFORMATION AVAILABLE <br />ON THE SNOHOMISH COUNTY <br />WEBSITE, <br />3,656 <br />GR 1 1 9 <br />CUT = 135 CoY. <br />FILL — 135 C.Y. <br />GRADING QUANTITIES. ESTIMATED BASED <br />ON CURRENT SITE INFORMATION & <br />ASSUMED EXCAVATIONS NECESSARY FOR <br />PROPOSED IMPROVEMENTS. <br />WINFIrifffffifflowITEW <br />f <br />�1111;11111pg gill <br />1, APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE <br />AN APPROVAL OE PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF <br />ROADS, PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES); <br />2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, <br />REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE <br />APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED AND <br />VEGETATION/LANDSCAPING IS ESTABLISHED, <br />3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY' <br />FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO <br />DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS SHALL BE PERMITTED. THE FLAGGING <br />SHALL BE MAINTAINED BY THE APPLICANT/CONTRACTOR FOR THE DURATION OF <br />CONSTRUCTION, <br />4 THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH <br />ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO ENSURE THAT <br />SEDIMENT AND SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE SYSTEM, <br />ROADWAYS, OR VIOLATE APPLICABLE WATER QUALITY STANDARDS. <br />5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR <br />ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES <br />SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT <br />SEDIMENT" AND SEDIMENT -LADEN WATER DO NOT LEAVE 'iHE SITE, <br />6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY THE <br />APPLICANT/CONTRACTOR TO ENSURE THEIR CONTINUED FUNCTIONING, ESPECIALLY AFTER <br />STORM EVENTS. <br />7. THE ESC FACILITIES ON INACTIVE" SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM <br />OF ONCE A MONTH OR WITHIN THE 46 HOURS FOLLOWING A MAJOR STORM EVENT. <br />B. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE <br />WITHIN A TRAPPED CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE <br />CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN <br />WATER INTO THE DOWNSTREAM SYSTEM. <br />9, STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF <br />CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL <br />MEASURES MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR <br />THE DURATION OF THE PROJECT, <br />10. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE DEBRIS AND <br />SEDIMENT TRACKED OFF THE SITE. <br />11. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM ENTERING SURFACE <br />WATER BODIES IF THE PROPOSED BMPS FAIL. <br />12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZD FOR <br />NO MORE THAN 2 DAYS FROM OCTOBER 1 THROUGH APRIL 30, AND FOR NO MORE THAN <br />7 DAYS FROM MAY 1 THROUGH SEP TEMBER 30. <br />LANDSCAPE <br />J ESM'T <br />w PUBLIC <br />DRAINAGE. <br />9 <br />°3ja� [m mdi Yi <br />z <br />Nw <br />J [ <br />edam <br />0. <br />J 25 INGRESS, EGRESS <br />J U I-ITILY ESM'T 4 _{ <br />J Li <br />1 I i <br />W <br />e o.® LEGEND <br />X— SILT FENCE PER COE STD DWG 214 <br />WM CLEARING LIMITS PER BMPC103 <br />CB INLET PROTECTION <br />FIN <br />DRAWNQ NO. <br />OF <br />LL <br />�I <br />