My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1616 E MARINE VIEW DR 2019 Plans 2022-12-06
>
Address Records
>
E MARINE VIEW DR
>
1616
>
Plans
>
1616 E MARINE VIEW DR 2019 Plans 2022-12-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2022 1:31:12 PM
Creation date
8/18/2021 10:48:17 AM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
1616
Permit
PW1910-023
Year
2019
Notes
INSTALL 12 REMEDIATION WELLS TO 30' DEEP
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADAPTOR SKIRT <br />TRIM TO WITHIN <br />rz ' <br />OF ORATE <br />E it <br />TRIAL STRAP <br />OVERFLOW- BYPASS FOR PEAK <br />STORM 'BOLL` <br />SEDIMENT <br />AOOiILATION <br />NOTES: <br />I. INSERT SHALL BE INSTALLED PRIOR O CLEARING AND GRADING ACTIVITY, OR UPON <br />PLACEMENT OF A NEW CATCHSIN. <br />. SEDIMENT SHALL HE REMOVED FROM THE UNIT WHEN IT BECOMES RALF PILL. <br />J. SEDIMENT REMOVAL 3 LL 6E ACCOMPLISHED BY RE OVNO THE INSERT, EN Imo, AND <br />RE-INSERTING IT INTO THE CATCH BASIN. <br />.......... <br />Scale: NTS 4 low i <br />Filter fabric material in continuous rolls, <br />Use staples or wire rings to attach fabric <br />to wire Wire mesh support fence <br />for slit film fabrics <br />l 1 <br />9 <br />Fes- <br />Bury bottom of filter material <br />in 4" by 4" trench <br />6' Max. <br />Wire mesh support fence <br />for slit film fabrics <br />Filter fabric <br />material <br />Min. 4" x 4" trench <br />Provide washed gravel <br />backfill or compacted <br />native soil as directed <br />by local government <br />Bury bottom of filter material <br />in 4" by 4" trench <br />Posts m WSDOT standard <br />specification 3gy01.3(9)A Skce-SILT FENCE <br />Scale. NTS I si- �M&& t <br />Earthln , <br />N <br />Posts - WSDOT standard <br />specifications A <br />.o0" MIN, <br />(1. 524m) <br />SANDBAG <br />SANDBAG <br />SOIL. OR PAVEMENT SOIL CAR PAVEMENT <br />FENCE <br />i2 �'� L !ER <br />a Pfa reAlong <br />Sow Contom <br />on Soil Typ, and <br />1op P_- 51t1 <br />,, v <br />it to s a ,l <br />!_ <br />A <br />,& r <br />Adimnt red <br />SA <br />aIld fgrtive !nI-e0f, 3m <br />f plurM bahiud tho irf; v�,. <br />9---C (7 5.1 2 sfriM) <br />- r <br />10" 0lA_ <br />} a `Ill <br />.tz _,'5rf` nq <br />01 .i <br />I. �3Luvr mot a3E-t oul jar rm z t'fd k1 Ls the has lofit QI d e ve. &I4kl�". ''C' � �!� �rl a I, �a���,, �' 5`" <br />n� P, 41r an cowo u . rqu1_4.'MN1 l.3i nit Incallow,-.,d [-.-q nru un&a ar aLunrid Tull, <br />STRAW <br />Scale: NTS <br />"I-EMPORARY EROSION AND SEDIMENT CONTROL <br />(TESC) REQUIREMENTS. <br />1. <br />ALL PROJECT WORK SHALL COMPLY WITH THIS TESC PLAN, CITY OF EVERETT 6. <br />LIMIT TRACK OUT OF MUD AND DIRT. INTO PUBLIC STREETS TO THE MAXIMUM <br />(COE) TESC REQUIREMENTS, AND COE WET SEASON REQUIREMENTS FOR WORK <br />EXTENT PRACTICAL. IF MUD IS TRACKED OFF A JOBSITE, THE CONTRACTOR SHALL <br />PERFORMED BETWEEN OCTOBER 1 AND APRIL 30. THE APPROVED PLAN IS THE <br />TAKE IMMEDIATE STEPS TO CLEAN THE PUBLIC ROAD AND PREVENT FURTHER <br />MINIMUM SYSTEM REQUIRED. AS CONDITIONS CHANGE, THE CONTRACTOR SHALL <br />TRACKING OFFSITE. <br />IMPLEMENT ADDITIONAL MEANS AS NEEDED. <br />7. <br />IF EROSION CONTROL MEASURES IN PLACE ARE NOT CONTROLLING SEDIMENT <br />2. <br />THE FOLLOWING CITY OF EVEETT AND SNOHOMISH COUNTY BMPS SHALL APPLY; <br />TRANSPORT INTO PUBLIC STORMWATER SYSTEMS OR PREVENTING TRACKING OF <br />• BMP E5.40 o REMOVAL OF EXCESS SOIL <br />MUD ONTO PUBLIC ROADS, ADDITIONAL EROSION CONTROL MEANS SHALL BE <br />• BMP E5.80 m STREET CLEANING <br />IMPLEMENTED. IF NECESSARY, THE PROJECT MAY BE SHUT DOWN WHILE THE <br />• BMP C101 - PRESERVING NATURAL VEGETATION <br />ADDITIONAL TESC MEASURES ARE BEING CONSTRUCTED. <br />® BMP C105 ® CONSTRUCTION ENTRANCE (PROVIDED BY OTHERS) <br />• BMP C123 ® PLASTIC COVERING FOR STOCKPILES 3. <br />WET SEASON REQUIREMENTS ARE AS FOLLOWS: <br />® BMP C140 ® DUST CONTROL <br />0 THE ALLOWED TIME THAT DISTURBED AREAS CAN REMAIN UNWORKED <br />® BMP C150 ® KEEPING ADDITIONAL TESC MATERIALS ON HAND <br />WITHOUT COVER MEASURES IS TWO DAYS. <br />® BMP C233 - SILT FENCE <br />® ALL DISTURBED SOILS SHALL BE PROTECTED PRIOR TO END OF DAY <br />a BMP C235 ® WATTLES <br />PRECEDING WEEKENDS AND HOLIDAYS. <br />® STOCKPILES SHALL BE STABILIZED WITH SEDIMENT TRAPPING MEASURES <br />3. <br />PROTECT STORMWATER INLETS IMPACTED BY THE WORK WITH STRAW WATTLES, <br />AND COVERED WITH ANCHORED PLASTIC OR GEOFA,BRIC. <br />COIR ROLLS OR STRAW BALES AS APPROPRIATE AND PROVIDE SEDIMENT SOCK <br />0 STOCKPILES, STEEP CUTS AND FILL SLOPES SHALL DE PROTECTED IF <br />INSERTS TO FILTER SEDIMENT FROM STORMWATER ENTERING THE INLET. INSTALL <br />UNWORKED FOR MORE THAN 72 HOURS. <br />SEDIMENT SOCK INSERTS INTO EACH CATCH BASIN INLET LOCATED ON -SITE AND <br />a COVER MATERIALS SUFFICIENT TO COVED DISTURBED AREAS SHALL BE <br />THOSE NEAREST AND DOWN GRADIENT OF THE SITE THAT ARE WITHIN 500 FEET <br />STOCKPILED ON SITE. THESE TESC MATERIALS SHALL INCLUDE: SILT FENCE <br />OF THE WORK. SEDIMENT SOCKS MUST BE INSPECTED AFTER STORM EVENTS AND <br />AND POSTS, SUFFICIENT PLASTIC OR GEOFABRIC SHEETING, ANCHORING <br />CLEANED IF SOCK IS FULL OR SAGGING. IF SEDIMENT CONTROLS ARE NOT <br />MATERIALS AND STRAW OR MULCH. THE QUANTITY OF EACH WILL BE <br />SUFFICIENT TO KEEP DISCHARGE TURBIDITY CONCENTRATION (OR PH) BELOW <br />ESTABLISHED BY THE INSPECTOR. MATERIALS SHALL BE RESTOCKED IF USED <br />REGULATED CONCENTRATION THEN THE SITE MANAGER MUST CONTACT THE COE <br />DURING THE WET SEASON. <br />INSPECTOR IMMEDIATELY. <br />a ALL UNPAVED AREAS THAT ARE TO BE UNWORKED DURING THE WET SEASON <br />SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET <br />4. <br />STRAW WATTLES SHALL CONSIST OF STRAW WRAPPED IN BIODEGRADABLE <br />SEASON (BY SEPTEMBER 24). APPLY MULCH TO ALL SEEDED AREAS, <br />TUBULAR PLASTIC OR SIMILAR ENCASING MATERIAL. STRAW WATTLES SHALL BE 3 <br />a FREQUENCY OF MAINTENANCE OF THE EROSION CONTROL BMPS INCREASES <br />TO 10 INCHES IN DIAMETER AND PLACED IN SHALLOW TRENCHES AND STAKED <br />FROM MONTHLY TO WEEKLY. <br />ALONG THE CONTOUR OF DISTURBED OR NEWLY CONSTRUCTED SLOPES, AS <br />0 SLOPE PROTECTION: DIVERT OFFSITE STORMWATER AWAY FROM EXPOSED <br />APPLICABLE. <br />SLOPES. DO NOT WORK SLOPES UNLESS IT IS NECESSARY. <br />0 CONSTRUCTION SHALL BE HALTED FOR THE WET SEASON IF THE EROSION <br />5. <br />STOCKPILES INACTIVE FOR 7 DAYS SHALL BE COVERED WITH SUITABLE <br />AND SEDIMENTATION CONTROL IS NOT MAINTAINED TO THE CITY'S <br />MATERIALS, ANCHORED AND PROTECTED FROM EROSION. DURING WET SEASON <br />SATISFACTION, AND IF THE PROJECT IS NOT PREPARED TO COMPLY WITH THE <br />WORK, PROVIDE STOCKPILE EROSION PROTECTION AS REQUIRED FOR WET <br />WET SEASON REQUIREMENTS. <br />F 0 OrUr II'� `ERG V_s <br />SEASON WORK.. a <br />� I , repui"eerA <br />PTO t��l,� ��� I,I y q��.vpryrya�q* �( 'ram—`v jj <br />M <br />r,' <br />SHEET: <br />3 sa <br />
The URL can be used to link to this page
Your browser does not support the video tag.