Laserfiche WebLink
s s s e a l a t a d <br />Ex loration Lo <br />earth s c i e n c e s <br />Project Number <br />Exploration Number <br />Sheet <br />i r c c r p o, e t e d <br />170081 E001 <br />I EB-3 <br />1 1 of 1 <br />Project Name Cascade High School Synthetic Turf Field Ground Surface Elevation (ft) 524 <br />Location Everett. WA Datum n a Hagan <br />Driller/Equipment Boretec / Track Date Start/Finish ,in117,1 q/17 <br />Hammer Weight/Drop 140# 13011 Hole Diameter (in) 6 inches <br />2 <br />t) <br />r <br />o <br />— Q <br />> <br />` <br />3 <br />Blows/Foot <br />N <br />�CD <br />o <br />T <br />DESCRIPTION <br />E <br />10 20 30 40 <br />O <br />•� <br />Grass / Topsoil <br />Sand <br />Fill <br />Very loose to loose, moist to very moist, dark brown, silty, organic -rich, fine <br />to medium SAND, trace (SM). <br />gravel <br />2 <br />S-1 <br />�4 <br />2 <br />5 <br />Vashon Lodgement Till <br />S-2 <br />:. _. =; <br />Very dense, moist, gray, silty, fine to medium SAND, some gravel; <br />10 <br />23 <br />A <br />660 <br />unsorted (SM). <br />37 <br />Dense, moist to very moist, blue -gray, fine to coarse SAND, some gravel; <br />fine is <br />S-3 <br />.'' -" <br />unsorted; to medium sand major constituent (SM). <br />14 <br />16 <br />30 <br />14 <br />Bottom of exploration boring at 9 feet <br />No ground water encountered. <br />10 <br />15 <br />Sampler Type (ST): <br />m 2" OD Split Spoon Sampler (SPT) Q No Recovery M - Moisture Logged by: DV <br />[D 3" OD Split Spoon Sampler (D & M) 1] Ring Sample SZ Water Level 0 Approved by: JHS <br />9 Grab Sample ® Shelby Tube Sample i Water Level at time of drilling (ATD) <br />