Laserfiche WebLink
associated <br />Exploration Lo <br />earth sciences <br />Project Number <br />Exploration Number <br />Sheet <br />in°r,rV*fiIPd <br />170081E001 <br />EB-6 <br />1of1 <br />Project Name Cascade High School Synthetic Turf Field Ground Surface Elevation (ft) 524 <br />Location Everett, WA Datum <br />Driller/Equipment Bore / Track Date Start/Finish 3/3/17 '13/17 <br />Hammer Weight/Drop 140# J 30" Hole Diameter (in) 6 Inches <br />w <br />o. <br />06 <br />- m <br />L <br />Blows/FootCL <br />H <br />N <br />S <br />T <br />E <br />— O <br />m <br />.L <br />DESCRIPTION <br />10 20 30 40 <br />O <br />y' <br />Grass / Topsoil <br />-------------- <br />Sand <br />Vashon Lodgement Till <br />Dense, moist, gray, silty, fine to medium SAND, some gravel; unsorted <br />-•. <br />(SM). <br />15 <br />S-1 <br />20 <br />41 <br />21 <br />5 <br />Becomes very dense, very moist. <br />S-2 <br />: • _• <br />15 <br />29 <br />A <br />650fif" <br />0! <br />Bottom of exploration boring at 6.5 feet <br />No ground water encountered. <br />10 <br />15 <br />Sampler Type (ST): <br />m 2" OD Split Spoon Sampler (SPT) No Recovery M - Moisture Logged by: DV <br />m 3" OD Split Spoon Sampler (D & M) Ring Sample SZ Water Level () Approved by: JHS <br />® Grab Sample 0 Shelby Tube Sample 1 Water Level at time of drilling (ATD) <br />