My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7807 EVERGREEN WAY LAUNDRY GENIUS 2022-02-03
>
Address Records
>
EVERGREEN WAY
>
7807
>
LAUNDRY GENIUS
>
7807 EVERGREEN WAY LAUNDRY GENIUS 2022-02-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2022 1:59:20 PM
Creation date
8/18/2021 2:33:11 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7807
Tenant Name
LAUNDRY GENIUS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,7/26/201 <br />City of Everett <br />7:07:09AM <br />INSPECTION ACTIVITY REPORT <br />Page I <br />Permit No. M2101-021 Site Address 7807 EVERGREEN WAY <br />Applied 1/7/2021 Applicant RICH BOYD Lot <br />Approved 4/l/2021 Owner DENH & FUNG INVESTMENT LLC Block <br />Issued 4/2/2021 Contractor CESCO NW ACQUISITION LLC Tract <br />Parent Permit No. B2101-005 Description MECHANICAL - TI CHANGE OF USE FROM SHOE STORE TO <br />Notes <br />Scheduled ComDleted TVDe Insnector Result Remarks InsDector's Comments <br />GAS 01-ROUGH IN MPI eTRAKiT Inspection 7/8/2021 4:35 PM CESCO NW <br />Request ACQUISITION LLC <br />Gas pressure test <br />Contact Name: CESCO NW <br />ACQUISITION LLC <br />Site Address: 7807 EVERGREEN WAY <br />Phone:2068249055 <br />e-Mail: darel@cescoequipment.com <br />5/26/2021 5/26/2021 MECH 04-ROUGH SDP CORRECTION eTRAKiT Inspection 5/25/2021 3:28 PM CESCO NW <br />IN Request ACQUISITION LLC <br />6/7/2021 <br />6/7/2021 GAS 01-ROUGH IN TAHU CORRECTION see notes <br />Contact Name: CESCO NW <br />ACQUISITION LLC <br />Site Address: 7807 EVERGREEN WAY <br />Phone:2068249055 <br />e-Mail: darel@cescoequipment.com <br />(5/26/2021 2:28 PM SDP) <br />1) Rest room exhaust - (IMC TBL <br />403.8.4.2) 80 CFM fans cannot use flex, 4" <br />smooth metal duct for 20' with 3 elbows is <br />allowed. See table for other options. Ok to <br />combine the two 4" ducts into a 6" or 8" <br />termination. <br />2) The termination for the above restroom <br />fans must be a direct connection to the roof <br />top termination. The inspector must see it. <br />Notes: All other mechanical will remain <br />exposed as a final product. <br />6/6/2021 2:47 PM CESCO NW <br />ACQUISITION LLC <br />gas rough in also finalize mechanical rough <br />in <br />Contact Name: CESCO NW <br />ACQUISITION LLC <br />Site Address: 7807 EVERGREEN WAY <br />Phone:2068249055 <br />e-Mail: darel@cescoequipment.com <br />(6/7/2021 10:27 AM TAHU) <br />Need a 15 psi test on gas line, IRC <br />(G2417.4 .1) test pressure <br />INSP12 CRWSYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.