|
Intake & Approval Sheet (FOR PERMIT STAFF ONLY) PERMIT
<br />F)ztoc-ODS
<br />BUILDING
<br />Intake OK by: Date:
<br />Intake Comments:
<br />❑ Route to Commercial Building
<br />❑ Route to Residential Building
<br />❑ Make this a "W" Permit
<br />Bld I/ ddn/Rem Size
<br />Garage/Accessory Struct. Size
<br />Number of Stories
<br />%
<br />Basement
<br />WNo ❑Yes , Fin / Unfin
<br />Type of Construction
<br />Occupancy Group
<br />f
<br />Occupancy Load
<br />'6 0
<br />Fire Sprinklers: pUpdate Existing ❑New System �d
<br />Reason Sprinklers Required:
<br />Fire Alarm: Update Existing El New System ❑Not Req'd
<br />Reason Fire Alarm Required:
<br />RCW 64.55 MF worksheet req'd for permit? []Yes 1EINo
<br />Add'I RCW 64.55 docs required prior to final? ❑Yes E�No
<br />VALUATION CALCULATION: Total $ JUc• 0OL? -1
<br />Additional Notes:
<br />r
<br />Approved Date:
<br />FIRE DEPARTMENT
<br />Separate / Deferred Submittals Required:
<br />El Fire Sprinklers ❑Fire Alarm ❑Other:
<br />Additional Notes:
<br />Fire Dept. Fees:
<br />❑ Review of As -Built Plans - NO FIRE FEE
<br />❑ Minimal or No Fire Scope - NO FIRE FEE
<br />:Review / Inspection Scope - ADD FIRE FEE
<br />Approved By: Date: 13e2�
<br />ELECTRICAL
<br />Additional Notes:
<br />Approved By: Date:
<br />PLANNING
<br />Intake OK by: Assign To: Date:
<br />Intake Comments:
<br />❑ Attach to Project No.
<br />❑ Route to Historic Reviewer
<br />❑ OK to Route to Other Departments
<br />❑ Hold in Planning File Drawer
<br />Zone
<br />Nonresidential Use
<br />Residential Use
<br />Proposed No. of Dwelling Units:
<br />Total No. of Dwelling Units:
<br />�"—
<br />Planning/Landscape Inspection Required before Final? ❑Yes u4NIo
<br />"In Lieu" Fee: Type: Amount $
<br />School Impact Fee: Total $
<br />Calculated: it:
<br />❑Everett School Dist QMlilkilteo School Dist
<br />Additional Notes:
<br />Approved Date:
<br />PUBLIC WORKS
<br />Intake OK by: Date:
<br />.......................... ....... ... ..... .................... ........ .... .,,,,..,,.,.,,,............................................... ...
<br />,.,...,,
<br />Intake Comments: PW Worksheet Needed if.•
<br />❑Sys Dev Eval []Traffic Mit Eval
<br />❑Site Work or Drainage Proposed
<br />❑Backflow Prevention for high hazard:
<br />:(dental, medical, animals, mortuary, hospital,
<br />:supportive housing)
<br />,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
<br />❑Route this folder for PW Review at end --- PW Review Worksheet
<br />❑This project also has a separate concurrent PW Review (Green Folder)
<br />AND ❑Create Green Folder []Submitted Previously ❑Deferred
<br />This Permit is Approved by Public Works
<br />❑ See PW Review Worksheet and associated attached items
<br />❑ A Separate PW Permit is Required (Permit #: PW )
<br />AND ❑ Is located in this folder
<br />❑ Is in a Separate Green Folder Qoin with this folder for permit issuance)
<br />❑ Will be issued separately (Separate Green Folder, PW issued ahead of Bldg)
<br />❑ Public Works has no scope --- PW Not Required
<br />Additional Notes:
<br />Approved By: Date: �, L
<br />-�Z
<br />
|