Permit#: B2001-038
<br />GENERAL NOTES
<br />Site Address: 2324100TH ST SE
<br />Owner: ALEMU SAMUELG & DESTA HELEN
<br />Tenant: [TenName]
<br />App. Date: 1/22/2020
<br />Proposed Use: SFR DETACHED
<br />Description: CONVERSION OF EXTG FAMILY ROOM TO
<br />8 AN ADDITIONAL BEDROOM
<br />JUN 2 4 2020 Reviewed By: Date:
<br />0
<br />�fFice Set !ob Site Set Fire/Planning Set
<br />CITY OF EVER ET'T
<br />.Permit Services - - -- -
<br />t
<br />z
<br />PROJECT
<br />SYMBOL NOTATION
<br />1. THESE GENERAL NOTES PERTAIN TO WORK DESCRIBED ON ALL CONTRACT
<br />OWNER: SAMUEL ALEMU & HELEN DETTA
<br />DOCUMENTS.
<br />=
<br />0
<br />WOOD FRAMING
<br />2324 100TH ST SE EVERET, WA 98208
<br />2. THE CONTRACT DOCUMENTS CONSIST OF THE OWNER CONTRACTOR
<br />NORTHAPR
<br />ASPHALT
<br />AGREEMENT, THE CONDITIONS OF CONTRACT (GENERAL, SUPPLEMENTARY,
<br />WOOD FRAMING
<br />BA.IrrNSULATIoN
<br />AND OTHER CONDITIONS), THE DRAWINGS, THE SPECIFICATIONS, AND ALL
<br />+
<br />(INTERR=EDMEMBEP>
<br />ADDENDA ISSUED PRIOR TO AND ALL MODIFICATIONS ISSUED AFTER
<br />coRNVZ
<br />CE111%HErG,Hr
<br />BRU
<br />EXECUTION OF THE CONTRACT.
<br />-A1' F',L-
<br />SPOT ELEVATION
<br />+C�D
<br />PROPERTY INFO
<br />3. eMD IS THE AUTHOR OF THESE PLANS AND CLAIMS A COPYRIGHT IN THESE
<br />UVELEUVA
<br />3 'F =-
<br />ROOFSL PE
<br />BLOCK
<br />PI ANS ANn THE nFSIr;N.q r.C)NTAINFn IN THFRF PI ANS THIq CI AIM IS MAnF
<br />n_� `i�--
<br />_...-------- -•-------•-------------- - - -- ---- -----. ------
<br />UNDER TITLE 17 OF THE UNITED STATES CODE AND ALL APPLICABLE TREATIES
<br />AND FOREIGN LAWS. THESE COPYRIGHTED DRAWING FILES ARE TO BE USED
<br />FOR REFERENCE ONLY. eMD WILL TAKE NO RESPONSIBILITY FOR ANY
<br />CHANGES MADE TO THESE DOCUMENTS BY ANOTHER PARTY AND NO LICENSE IS
<br />GIVEN FOR TRANSFER OF THESE COPYRIGHTS TO ANOTHER PARTY.
<br />4. THE WORK COMPRISES THE COMPLETED CONSTRUCTION REQUIRED BY THE
<br />- k7 , R4.YJFSOPEPL44 - -` SiNUEFE
<br />✓r^ 4
<br />1 _ BUILDSECTION = a= E ELFs.
<br />at.? x>' CUT n
<br />WINOMSYMBO G1tADEtEARTH
<br />'�'
<br />�'`� 2 ,pYA.FLSECTION c�,�T �; w � GRAV�.
<br />��? '1 ACCESSORY SYM ��
<br />ADDRESS:
<br />2324100TH ST SE
<br />EVERETT, WA 98208
<br />APN:
<br />28052000207500
<br />LOT:
<br />1
<br />ZONE:
<br />R-1
<br />CONTRACT DOCUMENTS AND INCLUDES ALL LABOR NECESSARY TO PRODUCE SUCH
<br />-
<br />ra
<br />`
<br />POSED
<br />--� -- - YPSU.MB0ARD
<br />CONSTRUCTION, AND ALL MATERIALS AND EQUIPMENT INCORPORATED OR TO
<br />DETAILCALLOUT
<br />c UUPUNE
<br />BE INCORPORATED IN SUCH CONSTRUCTION.
<br />_ r
<br />72
<br />E
<br />gYPSUMSHEATHING
<br />5. SHOP DRAWINGS, PRODUCT DATA AND SAMPLES ARE NOT A PART OF THE
<br />�
<br />CONTOUR LINE
<br />SHEET
<br />INDEX
<br />CONTRACT DOCUMENTS. THE DESIGNER WILL REVIEW THEM, BUT ONLY FOR
<br />'"�"'
<br />PPOPEMLINE
<br />CPIEttTTED Srr11N
<br />BOARD
<br />CONFORMANCE WITH THE DESIGN CONCEPT OF THE WORK AND WITH THE
<br />=+ Ar1 4 ELEVA Nest a' A MATCH LINE Pcr4vaDs sEArHiNc
<br />INFORMATION GIVEN IN THE CONTRACT DOCUMENTS, THE CONTRACTOR
<br />i �•
<br />SHALL NOT BE RELIEVED OF RESPONSIBILITY FOR ANY DEVIATION FROM THE
<br />NAME
<br />_ -�_
<br />CENTERUNE
<br />r.
<br />� R-0INSULAMON
<br />A0.1 TITLE SHEET
<br />A1.0 SITE
<br />REQUIREMENTS OF THE CONTRACT DOCUMENTS BY THE DESIGNER REVIEW OF
<br />0
<br />RhNAME�
<br />= SA,ND!MORrERz
<br />A2.0 DEMO PLAN
<br />SHOP DRAWINGS, PRODUCT DATA OR SAMPLES.
<br />-PH--P+-
<br />PHaNTLINE
<br />- PLASTER
<br />A2.1 FLOOR PLAN
<br />6. THE CONTRACTOR SHALL CAREFULLY STUDY AND COMPARE THE CONTRACT
<br />'
<br />€i CLtHJO&
<br />--
<br />GAS
<br />5TErl
<br />SECTION PLAN
<br />DOCUMENTS AND SHALL AT ONCE REPORT TO THE DESIGNER ANY ERROR,
<br />NUMO -
<br />INCONSISTENCY OR OMISSIONS HE MAY DISCOVER. THE CONTRACTOR
<br />E
<br />CH.ANGEflFLOOR -E -E -
<br />E� "�� u"`E
<br />90NE
<br />ELECTRICAL PLAN
<br />A3.1 ELEVATION
<br />SHALL PERFORM NO PORTION OF THE WORK AT ANY TIME WITHOUT
<br />2PPE€
<br />�.==+--.�
<br />A'�'E`PB'`
<br />CONTRACT DOCUMENTS OR, WHERE REQUIRED, APPROVED SHOP DRAWINGS,
<br />-x -x --
<br />FENCE LINE
<br />�- �E"A
<br />A9.t DETAIL
<br />PRODUCT DATA OR SAMPLES FOR SUCH PORTION OF THE WORK.
<br />- -)
<br />CODES
<br />7. ALL WORK IS TO CONFORM WITH THE CONTRACT DOCUMENTS.''
<br />SANITARY SEVdEP -� 'WOM
<br />- �`
<br />DRAWINGS ARE NOT TO BE SCALED FOR INFORMATION IF UNABLE TO
<br />LOCATE DIMENSIONS FOR ANY ITEM OF WORK, CONSULT WITH THE
<br />t" t- + -,
<br />" `
<br />,PIDt�FaE, - a- � _
<br />TEC'VIS*NLINE
<br />yy
<br />DESIGNER BEFORE PROCEEDING WITH CONSTRUCTION.
<br />'
<br />-yv-rr -
<br />WATER LINE
<br />BASED ON THE 2015 LR.C, 2015 UPC, 2015 WA
<br />8. IN THE EVENT CERTAIN FEATURES OF THE CONSTRUCTION ARE NOT FULLY
<br />STATE ENERGY CODE, AND 2015 WA STATE
<br />SHOWN ON THE CONTRACT DOCUMENTS, THEN THEIR CONSTRUCTION SHALL BE
<br />AMENDMENTS
<br />OF THE SAME CHARACTER AS FOR SIMILAR CONDITIONS THAT ARE SHOWN
<br />OR CALLED FOR AND SHALL BE REVIEWED BY THE DESIGNER.
<br />9. ALL WORK SHALL BE PERFORMED WITHIN STRICT CONFORMANCE TO THE
<br />MINIMUM STANDARDS OF THE CURRENT EDITION OF THE INTERNATIONAL
<br />BUILDING CODE AND ALL APPLICABLE NATIONAL, STATE, AND LOCAL LAWS,
<br />Additional Permits Are Required
<br />REGULATIONS AND ORDINANCES.
<br />For This Project To Include:
<br />10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE GENERAL SAFETY
<br />DURING CONSTRUCTION, AND ALL WORK SHALL CONFORM TO PERTINENT
<br />SAFETY REGULATIONS.
<br />El Plumbing 0 Sprinkler
<br />11. THE CONTRACTOR SHALL COORDINATE LOCATIONS OF ANY AND ALL
<br />0
<br />Mechanical ❑ Fare Alarm
<br />MECHANICAL, TELEPHONE, ELECTRICAL, LIGHTING AND PLUMBING INCLUDING
<br />ALL PIPING, DUCT WORK AND CONDUIT. COORDINATE ALL REQUIRED
<br />CLEARANCES FOR INSTALLATION AND MAINTENANCE OF THE ABOVE
<br />Electrical
<br />EQUIPMENT.
<br />12. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK USING HISMER
<br />BEST SKILL AND ATTENTION, HE/SHE SHALL BE SOLELY RESPONSIBLE FOR ALL
<br />CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES
<br />AND FOR COORDINATING ALL PORTIONS OF THE WORK UNDER THE
<br />CONTRACT.
<br />13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACTS AND OMISSIONS
<br />OF HIS/HER EMPLOYEES, SUBCONTRACTORS AND THEIR AGENTS AND
<br />EMPLOYEES, AND OTHER PERSONS PERFORMING ANY WORK UNDER A
<br />CONTRACT WITH THE CONTRACTOR.
<br />14. THE CONTRACTOR SHALL PURSUE WORK IN A CONTINUOUS AND DILIGENT
<br />MANNER TO INSURE TIMELY COMPLETION OF THE PROJECT.
<br />15. THE CONTRACTOR AT ALL TIMES SHALL KEEP THE PREMISES FREE FROM
<br />PROPANE TANKS, HEAT PUMPS AND
<br />ACCUMULATION OF WASTE MATERIALS OR RUBBISH CAUSED BY HISMER
<br />OPERATIONS. AT THE COMPLETION OF THE WORK, HE/SHE SHALL REMOVE
<br />OTHER EQUIPMENT OR APPURTENANCES
<br />ALL
<br />MAY NOT BE LOCATED IN THE FRONT
<br />HIS/HER WASTE MATERIALS AND RUBBISH FROM AND ABOUT THE PROJECT
<br />WELL AS ALL HIS/HER TOOLS, CONSTRUCTION
<br />AND SIDE SETBACKS. PROPANE TANKS
<br />AS EQUIPMENT, MACHINERY,
<br />AND SURPLUS MATERIALS.
<br />REQUIRE ADDITIONAL PERMITS ISSUED
<br />16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION AND/OR
<br />BY THE EVERETT FIRE DEPARTMENT
<br />PROTECTION OF ALL EXISTING AND PROPOSED PIPING, UTILITIES,
<br />PRIOR TO INSTALLATION.
<br />STRUCTURES, ADJACENT STREETS, AND IMPROVEMENTS DURING THE PERIOD OF
<br />CONSTRUCTION.
<br />17. UNLESS OTHERWISE PROVIDED IN THE CONTRACT DOCUMENTS, THE
<br />CONTRACTOR SHALL PROVIDE AND PAY FOR ALL LABOR, MATERIAL,
<br />It Is owners responsibility to esrav►lsa anu 4wne aL
<br />EQUIPMENT, TOOLS, CONSTRUCTION EQUIPMENT, MACHINERY, WATER,
<br />property lines,
<br />HEAT, UTILITIES, TRANSPORTATION, AND OTHER FACILITIES AND SERVICES
<br />NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF THE WORK.
<br />18. WHERE CONFLICTS OCCUR, COORDINATE THE LAYOUT AND EXACT
<br />IP BUILDING IS NOT POSITIONED A9
<br />LOCATION OF ALL PARTITIONS, DOORS, TELEPHONES AND
<br />INDICATED ON APPROVED SITE PLAN,
<br />ELECTRICAUCOMMUNICATION OUTLETS AND SWITCHES WITH DESIGNER IN
<br />A NEW SITE PLAN SHALL BE SUBMIT -
<br />THE FIELD BEFORE PROCEEDING WITH CONSTRUCTION.
<br />TED, NO FURTHER INSPECTIONS WILL
<br />19. WHERE CONFLICT IS ENCOUNTERED BETWEEN THE CONTRACT DOCUMENTS
<br />BE MARE ON THIS PROJECT UNTIL THE
<br />THAT WILL MATERIALLY AFFECT THE QUALITY OR EXTENT OF THE WORK,
<br />SUCH CONFLICT SHALL BE RESOLVED TO THE SATISFACTION OF THE DESIGNER
<br />EYISED SITE PLAN HAS BEEN APPR®�-
<br />BEFORE THE AFFECTED ITEMS AND/OR MATERIALS ARE PURCHASED, FABRICATED
<br />ED BY THE BUILDINGIPUBLIC WORKS
<br />AND/OR INSTALLED.
<br />OEM,
<br />20. WHERE PRE MANUFACTURED OR PREFABRICATED ITEMS AND/OR MATERIALS_
<br />3
<br />ARE TO BE INSTALLED -THE CONTRACTOR SHALL VERIFY ROUGH OR FINISHED
<br />GRADING AND DRAINAGE
<br />DIMENSIONS IN THE FIELD PRIOR TO PURCHASE OR FABRICATION.
<br />21. THE CONTRACTOR SHALL GUARANTEE ALL WORK AND MATERIALS TO BE
<br />FREE FROM DEFECTS FOR A MINIMUM OF ONE YEAR FROM DATE OF FINAL
<br />1. Provisions shall be made for the control and drainage Of surface
<br />ACCEPTANCE, AND PROMPTLY REMEDY SUCH DEFECTS AND ANY SUBSEQUENT
<br />water around buildings by: gutters, drain lines, inlets and catch
<br />DAMAGE CAUSED BY THE DEFECTS OR REPAIR THEREOF, AT NO EXPENSE TO
<br />basins or other necessary drainage structures and shall be installed
<br />THE OWNER. GUARANTEE PERIODS OF GREATER THAN ONE YEAR MAY BE
<br />REQUIRED AND CONTAINED WITHIN THE CONTRACT DOCUMENTS.
<br />where storm water dis p osa I cannot b obtained without their use or
<br />22. UNLESS OTHERWISE PROVIDED IN THE CONTRACT DOCUMENTS THE
<br />where erosion cannot be prevented by finish grading and planting.
<br />CONTRACTOR SHALL SECURE AND PAY FOR THE BUILDING PERMIT AND FOR ALL
<br />Dry wells shall not be installed in areas where the soil is not well
<br />OTHER PERMITS AND GOVERNMENTAL FEES, LICENSES AND INSPECTIONS
<br />drained and,(or
<br />NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF THE WORK.
<br />porous.
<br />23. WHERE ANY ITEM AND/OR MATERIAL IS INDICATED IN THE CONTRACT
<br />DOCUMENTS, AND NOT NECESSARILY DETAILED IN EACH SPECIFIC CASE, BUT IS
<br />2. Grading shall be provided to insure:
<br />REQUIRED FOR A COMPLETE AND PROFESSIONAL INSTALLATION SUCH ITEM
<br />AND/OR MATERIAL SHALL BE PROVIDED AS IF SHOWN AND DETAILED IN FULL.
<br />(a) Diversion of water away from buildings.
<br />PROVIDE MEANS TO FURNISH AND INSTALL.
<br />(b) Prevention of standing water and soil saturation detrimental
<br />to structures and lot use.
<br />(c) That natural drainage channels or basins are not blocked or
<br />filled.
<br />(d) Provisions for the disposal of water from a lot.
<br />(e) ,Protection of adjoining property,
<br />OCCUPANCY GROUP
<br />R
<br />CONSTRUCTION TYPE
<br />VB
<br />FLOOR AREA (SF) LIVING GARAGE
<br />EXISTING UPPER LEVEL 1,702SF I
<br />EXISTING ATTCHED GARAGE 420SF
<br />TOTAL LIVING AREA 1,702SF 420SF
<br />REQUIRED SEPARATION
<br />NO
<br />#OF STORIES
<br />1
<br />FULLY SPRINKLERED
<br />NO
<br />PROJECT DESCRIPTION
<br />1. CONVERTING EXIST. FAMILY ROOM TO A
<br />ADDITIONAL BEDROOM & ADDING GRAB BARS TO
<br />EXIST. BATHROOMS.
<br />VICINITY MAP
<br />PROJECT LOCATION
<br />U_
<br />Q
<br />Q
<br />U)
<br />W
<br />0
<br />z
<br />W
<br />.I
<br />W
<br />Z
<br />W
<br />U
<br />rr,F-O
<br />V >
<br />w
<br />CL
<br />20:4 1 flDtl-: z
<br />rr RR
<br />greet Souiheast V
<br />U)
<br />W
<br />0
<br />0
<br />CITY OF EVERETT
<br />a w
<br />REVIEWED FOR PERMIT
<br />w
<br />w
<br />v7
<br />00
<br />0
<br />C
<br />0
<br />W
<br />`W
<br />i
<br />W
<br />P
<br />��W^^
<br />VJ
<br />F_
<br />W
<br />F-
<br />Q
<br />T'
<br />lt
<br />CV
<br />
|