Laserfiche WebLink
DUAL GLAZED SOLID WALL DBL. 2x FRAMING <br />VINYL SHEATHING @ WINDOW <br />WINDOW SYSTEM NEW OR EXIST. (SEE <br />(3) COAT STUCCO SYSTEM CORNER BEAD CORN <br />TJI'S OR 2X STRUCT.) CORNER BEAD <br />WINDOW 1/2" <br />O/LATH O/TYVEK STUCCO '— JOIST OR GYP. BD. SHIM AS REQ'D. <br />,`r <br />HEADER i WRAP SHIM AS REQ'D. RAFTER, TYP. <br />(SEE ( - <br />STRUCT.) SOLID WALL SEALANT W/ <br />2x4 FLAT @ 4' -0" SILL <br />SHEATHING 2x4 STUD WALL @ 16" O.C. <br />BACKER BELOW <br />` (SEE ROD O'C GYPSUM BOARD 2x DF STUD <br />STRUCT.) <br />DBL. 2x FRAMING NAILING AS REQUIRED WALL W/ BATT <br />BUTYL RUBBER FLASHING @ WINDOW _ - - - - - - - - _ INSULATION. <br />JAMB. <br />1/2" GYP. BD. W/ SELF -ADHESIVE ' ' 2x4 BOTTOM PLATE <br />BACKING. APPLY OVER BUTYL RUBBER FLASHING W/ SELF - <br />INFILTRATION BARRIER I ADHESIVE BACKING. APPLY OVER <br />AS SHOWN. ' INFILTRATION BARRIER AS SHOWN. _ <br />o <br />SEALANT AS REQ'D. <br />26 GA. GALV, 1/2" GYP. BD. ( = 5/8"GYP. BD. CEiL, 3/4" SUB FLOOR — — — — <br />%-< <br />HEAD �P' 11 7/8" TA 25's <br />FLASHING L SOLID WALL SHEATHING (SEE NEW SIDING 0/HOUSE <br />CORNER SHIM AS NECESSARY STRUCT.) _ WRAP TO MATCH EXIST. <br />BEAD n DUAL GLAZED I 2x DF STUD WALL W/ DUAL GLAZED <br />VINYL '-i BATT INSULATION. SEE PLAN FOR BUTYL RUBBER VINYL <br />WINDOW SYSTEM ( WALL TYPE FLASHING <br />(2) COAT STUCCO SYSTEM U SEALANT <br />W/ <br />CvcTEM <br />W/ SELF -ADHESIVE <br />SEALANT <br />W/ ELASTOMERIC FINISH BACKING. APPLY OVER BACKER <br />INFILTRATION BARRIER ROD <br />AS SHOWN. <br />TYP. WINDOW HEAD TYP. WINDOW SILL TYP. WALL AT FLOOR TYP. WIN. JAMB DET. <br />TYP. WALL AT CEILING _ <br />10 3�" = 1'-0" 2 3„ ^ 1'-0" 4 5 1 1/2" ^ 1'_0 6 3" _ 1 0„ <br />NEW 2X OR 5/4 BOARD RAIL CAP: ' ; <br />STEP 1 - WCORNER STEP 2 SAF TABS STEP 3 - SAF SILL STEP 4 - SAF JAMB STEP 5 S - WINDOW ATTACH TO GUAR POOSTW/ 3je ��G <br />SAF ILL FLASHING 12 3 LONG SCREWS. <br />7 <br />GRACE "VYCORNER" SELF ADHESIVE ,,,`' e"o eAms <br />OR SIMILIAR FLASHING (SAF)., <br />2X STUDS <br />@ 16" OC U.O.N FRAMING/ <br />TYP. INSUL <br />LEAVE 4" OF PAPER � <br />3/4" T&G PLY/OSB <br />ON BOTTOM OF SILL NEW 4X4 POST, TYP--� c, <br />EXIST. FLOOR JOISTS <br />FLASHING (TO BE <br />ADHERED TO <br />BUILDILNG WRAP) RIM JOIST — <br />EXIST. 2X DECKING 0/ <br />'v FLOOR JOIST 00 <br />T T 1/2" DIA. THROUGH <br />00 <br />T T BOLTS AND WASHERS <br />EXIST. FOUNDATION <br />EXIST. CMU PIER BLOCK a e a <br />STEP 6 SECOND SAF JAMB STEP 7 METAL HEAD FLASHING STEP 8 - BUILDING WRAP STEP 9 - SAF HEAD FLASHING ExtsT.TYPtCALcoNc. <br />a FTG.uj <br />LEAVE 4" OF PAPER ON SIDE METAL HEAD FLASHING < d I I�_I—I 111I <br />OF JAMB FLASHING (TO BE W <br />ADHERED TO BUILDING WRAP) ` <br />7 <br />TYP. FOUNDATION D � <br />DECK/HAND RAIL. DET. 8 1 =1_0 2 Lu <br />�. <br />J <br />T Q <br />{ I D <br />I <br />r ( <br />N <br />ff IF <br />I II I Q M <br />N <br />I� ADHERE SILL & JAMB <br />FLASHING TO <br />LAP ONTO SIDE BUILDING WRAP <br />OF WINDOW <br />NOTE: HOSE TEST FIRST WINDOW INSTALLED TO TEST FOR WATER INFILTRATION <br />uj <br />V Q <br />V <br />TYPICAL. WINDOW FLASHING `� W <br />3 3" _ 1'-0" CL W <br />acLnz <br />V / W <br />W v <br />CL <br />a <br />Z <br />0 <br />tA <br />uj <br />Z ON p <br />REVIDNED FOR PERMIT Lu <br />v Q <br />