My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3301 LOMBARD AVE COMPASS HEALTH SUPPORTIVE HOUSING 2022-02-18
>
Address Records
>
LOMBARD AVE
>
3301
>
COMPASS HEALTH SUPPORTIVE HOUSING
>
3301 LOMBARD AVE COMPASS HEALTH SUPPORTIVE HOUSING 2022-02-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2022 3:43:15 PM
Creation date
8/19/2021 9:39:07 AM
Metadata
Fields
Template:
Address Document
Street Name
LOMBARD AVE
Street Number
3301
Tenant Name
COMPASS HEALTH SUPPORTIVE HOUSING
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STORMWATER SITE PLAN <br />COMPASS HEALTH SUPPORTIVE HOUSING <br />Roof Areas: <br />Full Dispersion: Is infeasible due to previous development. <br />Downspout Full Infiltration: Infeasible due to the large cuts into the Till soils. <br />Bioretention: See the text for bioretention above. <br />Downspout Dispersion: There is no area in which to disperse runoff. <br />NOVEMBER 7, 2019 <br />PAGE 10 <br />Perforated Stub -out Connections: The distance between the roof collector and the detention <br />pipe is short and again will be in the Till. It is expected that any flow through the <br />perforations will continue along the outside of the pipe and to the footing drains for the <br />detention pipe. This is not optimal. <br />Lawn and Landscaped Areas: <br />BMP T5.13 Post Construction Soil Quality and Depth will be implemented on disturbed and <br />landscaped areas. <br />BMP T5.13 POST CONSTRUCTION SOIL QUALITY AND DEPTH <br />Post Construction Soil Quality and Depth will be used on the site to recondition those areas <br />that have been compacted by construction traffic. Additional information is provided on the <br />landscape plans that are part of the construction permit submittal. <br />Conclusion: <br />Having reached the end of List #2, the project will comply with BMP T5.13. <br />P:\Work\Projects\2017\17-125 Environmental Works\CE\DOCS\Final SSP 17-125.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.