Laserfiche WebLink
0 <br />Sabrina Fandler <br />From: Christina Congdon <CCongdon@eworks.org> <br />Sent: Monday, July 29, 2019 3:29 PM <br />To: Teresa Weldon; Sabrina Fandler; Tony Lee <br />Cc: Bill Singer; Melissa Schoch <br />Subject: Compass Health PSH: Temporary Excavation Plan <br />Attachments: 17399 - Excavation Considerations - Compass Health.pdf, Compass Health Supportive <br />Housing -Temp Excavation Plan_7-25-19.pdf <br />Teresa, Sabrina and Tony, <br />In our permit submittal we called out a deferred submittal for the shoring design but after looking at this closer realized <br />we do not need to have shoring on this project. Please see attached letter from Geotech and plan from the Structural <br />Engineer that explains our approach to excavation. Is it acceptable to submit these documents via this email or do I <br />need to submit hard copies? <br />Permit numbers for reference. <br />Building: B 1907-014 <br />Public Works:Pw19O7O-020 <br />Let me know! Thanks! <br />Christina Congdon, LEED AP, BD+C <br />Project Manager // Operations Manager <br />206.787.1369 <br />Pronouns : She / Her / Hers <br />eworks.org I Sign up for our newsletter <br />�` <br />3. <br />F E V E I <br />E 8 <br />