My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3301 LOMBARD AVE COMPASS HEALTH SUPPORTIVE HOUSING Geotech Report 2022-10-25
>
Address Records
>
LOMBARD AVE
>
3301
>
COMPASS HEALTH SUPPORTIVE HOUSING
>
Geotech Report
>
3301 LOMBARD AVE COMPASS HEALTH SUPPORTIVE HOUSING Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:51:03 PM
Creation date
8/19/2021 9:54:47 AM
Metadata
Fields
Template:
Address Document
Street Name
LOMBARD AVE
Street Number
3301
Tenant Name
COMPASS HEALTH SUPPORTIVE HOUSING
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Compass Health <br />August 31, 2017 <br />ADDITIONAL SERVICES <br />JN 17399 <br />Page 13 <br />In addition to reviewing the final plans, Geotech Consultants, Inc. should be retained to provide <br />geotechnical consultation, testing, and observation services during construction. This is to confirm <br />that subsurface conditions are consistent with those indicated by our exploration, to evaluate <br />whether earthwork and foundation construction activities comply with the general intent of the <br />recommendations presented in this report, and to provide suggestions for design changes in the <br />event subsurface conditions differ from those anticipated prior to the start of construction. However, <br />our work would not include the supervision or direction of the actual work of the contractor and its <br />employees or agents. Also, job and site safety, and dimensional measurements, will be the <br />responsibility of the contractor. <br />During the construction phase, we will provide geotechnical observation and testing services when <br />requested by you or your representatives. Please be aware that we can only document site work <br />we actually observe. It is still the responsibility of your contractor or on -site construction team to <br />verify that our recommendations are being followed, whether we are present at the site or not. <br />The following plates are attached to complete this report: <br />Plate 1 Vicinity Map <br />Plate 2 Site Exploration Plan <br />Plates 3 - 4 Test Pit Logs <br />Plate 5 Test Boring Log <br />Plate 6 Typical Footing Drain Detail <br />Plate 7 Typical Shoring Drain Detail <br />We appreciate the opportunity to be of service on this project. Please contact us if you have any <br />questions, or if we can be of further assistance. <br />Thor Christensen, P.E. <br />Senior Engineer <br />Respectfully submitted, <br />GEOTECH CONSULTANTS, INC. <br />D. Robert Ward, P.E. <br />Principal <br />GEOTECH CONSULTANTS, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.