My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4707 31ST AVE SE 2021-12-15
>
Address Records
>
31ST AVE SE
>
4707
>
4707 31ST AVE SE 2021-12-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 12:04:28 PM
Creation date
8/19/2021 11:22:10 AM
Metadata
Fields
Template:
Address Document
Street Name
31ST AVE SE
Street Number
4707
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t� <br />EVERETT <br />WASHINGTON <br />PUBLIC$IORKS PERMIT <br />City of Everett Permit Services <br />3200 Cedar Street, 2"d Floor <br />Everett, WA 98201 <br />425-257-8810 <br />ate Applied: 10/19/2019 <br />Public N6rks Permit #: PW1910-043 <br />Associated Bldg Permit #: C1910-001 <br />Planning Reference #: SUB14-002 <br />Public Works Fee: $65.00 <br />OWNER NAME AND ADDRESS: <br />APPLICANT NAME AND ADDRESS: <br />POLYGON WLH LLC <br />[AppName] <br />11624 SE 5TH ST SUITE 100 <br />[AppAdd] � e, nEC <br />:a U�jJ <br />BELLEVUE, WA, 98005 <br />[AppCi], [AppSt], [AppZip] <br />PHONE:4255867700 <br />PHONE: [AppPhonel <br />TAX PARCEL ID #: 00574700100102 <br />SITE ADDRESS: 4707 31ST AVE SE <br />DESCRIPTION: NEW SFR - LOT 353 <br />PLAN #3020 B - LOT 353 <br />LOT 53, DIVISION III OF OVERLOOK AT RIVERFRONT DEVELOPMENT <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />PERMIT CONDITIONS: <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett 'Design and Construction Standards and <br />Specifications for Development'. <br />3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br />4. No dirt, mud, rocks, or debris to be tracked onto roadway. <br />5. Inspections are required for all stages of construction. Visit the City's Online Permitting Portal at https:Hpw.everettwa.gov to <br />formally request all required inspections. A handout is provided at permit issuance with instructions on how to request an inspection <br />online. <br />6. Install any erosion control measures as determined by the Public Works Inspector, such as silt fence, straw bales, swales, or erosion <br />blankets. <br />7. Connect side sewer per City Standard #'s 601 through 604. <br />8. Connect rooftop downspouts to the drainage system provided for this lot. <br />9. No building materials to be stacked on sidewalk/roadway and sidewalk/roadway to be kept clean and open for pedestrian travel. <br />10. Public Works Construction shall be done per approved plan dated 10/21/2019. (Copy attached) <br />11. Construct foundation only until Plat is final. <br />Public Works Permit Fee Breakdown: <br />PW Plan Re.............$20.00 <br />PW Site Inspspectiction.......... $20.00 �U�„�- <br />Driveway..........................$25.00 <br />DEC 13 2019 �� <br />CITY OF EVERET <br />Permit ir <br />City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and save harmless <br />the City of Everett from any and all claims for damages, costs, expenses, or <br />16/ ZrlO6 causes of action that may arise because of installation and maintenance of <br />Approved for Construction (Public Works) D to the improvement or other right-of-way use here to applied for and further <br />agrees to remove same upon notice from the City and to replace public <br />prope y damage thereby. <br />FINAL INSPECTION Date <br />Approved as Constructed (PW Inspector) Signature of App cant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAYBE CANCELLED BY THE <br />CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION. EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />F7W <br />
The URL can be used to link to this page
Your browser does not support the video tag.