My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1802 75TH ST SW 2021-12-30
>
Address Records
>
75TH ST SW
>
1802
>
1802 75TH ST SW 2021-12-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2021 12:11:01 PM
Creation date
8/20/2021 7:30:04 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1802
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Targeted Drainage Report — Twentieth Ave Substation <br />WO# 100026553 <br />1.2 EXISTING CONDITIONS <br />In addition to existing Twentieth Avenue substation, the site is in use as the District's Operations Center. <br />Twentieth Avenue substation consists of (2) metalclad switchgear units, a control house, 12kV switches, (2) <br />115kv-12kV power transformers, 115kV circuit switchers, 115kV switches, transmission termination structures <br />(dead ends), cables, conduits, grounding system and various ancillary electrical equipment. <br />The site is bordered; westerly by the Boeing plant, northerly by Community Transits Seaway Transit Center, <br />easterly by commercial businesses and southerly by State Route 526. <br />The site is subject to a number of different easements. In the area of the project site include AFN 201703025002 <br />which includes an 8' easement for CT upon District property, a 20' and 30' easement for the District upon CT <br />property and a.signal loop easement. Review the site plan S-76-K2 for greater detail. <br />The Operations Center storm drainage is serviced by a numerous catch basins and drainage pipes which collect <br />and convey the runoff to either the northerly detention pond or the southerly detention pond. Twentieth <br />Avenue substation is not connected to this drainage system. <br />The nature of substation construction results in little to no surface water runoff being generated on -site. The <br />substation is layered with 4-inches of substation rock (1-1/2" clear open graded rock) and typically underlain by <br />a permeable gravel base course material. The voids within these layers hold the surface water and allow it to <br />slowly infiltrate into the native soils below. <br />Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.