Laserfiche WebLink
Figure 1-2.4.1 Flow Chart for Determining Requirements for New <br />Development <br />Start Here <br />Does the site have 35%, <br />or more of existing <br />Impervious coverage? <br />No <br />Does the project result in <br />5,000 square feet, or NO <br />greater, of new plus <br />replaced hard surface <br />area? <br />Yet Y <br />es <br />All Minimum Requirements <br />apply to the new and replaced <br />hard surfaces and converted <br />vegetation areas. <br />See Redevelopment Minimum <br />Requirements and Flow Chart <br />(Figure 1-2.4.2). <br />Does the project convert 34 <br />acres or more of vegetation to <br />lawn or landscaped areas, or <br />convert 2.5 acres or more of <br />native vegetation to pasture? <br />No <br />Minimum Requirements #1 <br />through #5 apply to the new <br />and replaced hard surfaces <br />and the land disturbed. <br />Does the project result In 2,000 <br />square feet, or greater, of new plus <br />replaced hard surface area? <br />Yes INO <br />/F—Does the project have land <br />disturbing activities of 7,000 <br />Yet square feet or greater? <br />lNo <br />Minimum Requirement#2 <br />applies. <br />Figure f-2.4.1 - <br />Flow Chart for Determining Requirements for <br />New Development <br />DEPARTMENT OF <br />Revised June2615 <br />ECOLOGY <br />pleaseseehftpYAvmvecywa.gov/copyrighthbWforoopyd.ghtnoticelndudingpermissbns, <br />State ofWashington <br />[Irnhationofliabrlity,and disdaimer. <br />2014 StormwaterManagement Manual for Westem Washington <br />Volume l - Chapter2 - Page 37 <br />