Laserfiche WebLink
Intake & Approval Sheet 40 (FOR PERMIT STAFF ONLr a PERMIT # "M 1 �_ d 21 <br />BUILDING <br />Intake OK by: Date: <br />Intake Comments: <br />❑ Route to Commercial Building <br />❑ Route to Residential Building <br />❑ Make this a "W" Permit <br />Bldg/TI/Addn/Rem Size <br />f -FfiL <br />Garage/Accessory Struct. Size <br />Number of Stories <br />Basement <br />MNo ❑Yes , Fin / Unfin <br />Type of Construction <br />Occupancy Group <br />Occupancy Load <br />.2 <br />Fire Sprinklers: ®Update Existing ❑New System ❑Not Req'd <br />Reason Sprinkl rs Required: <br />Fire Alarm: Update Existing ❑New System ❑Not Req'd <br />Reason Fire Alarm Required: <br />RCW 64.55 MF worksheet req'd for permit? ❑Yes 171 <br />Lw No <br />Add'l RCW 64.55 does required prior to final? ❑Yes W No <br />VALUATION CALCULATION: Total $ -"OnO <br />Additional Notes: <br />Approved By: Date: rj ,247A <br />FIRE DEPARTMENT <br />Separate / Deferred Submittals Required: <br />Ekire Sprinklers DiFire Alarm ❑Other: <br />Additional Notes: , <br />Fire Dept. Fees: <br />❑ Review of As -Built Plans - NO FIRE FEE <br />❑ Minimal or No Fire Scope - NO FIRE FEE <br />EE�RevieW / Inspection Scope - ADD FIRE FEE <br />Approved By: pLoDate: <br />ELECTRICAL <br />Additional Notes: <br />Approved By: Date: <br />PLANNING <br />Intake OK by: Assign To: Date: <br />Intake Comments: <br />❑ Attach to Project No. <br />V❑ ute to Historic Reviewer <br />OK to Route to Other Departments <br />Hold in Planning File Drawer <br />Zone <br />-� <br />Overlay/Agreement <br />Nonresidential Use <br />p p <br />Residential Use <br />Proposed No. of Dwelling Units: <br />"— <br />Total No. of Dwelling Units: <br />Planning/Landscape Inspection Required before Final? ❑Yes o <br />"In Au" Fee: Typ Amount $ <br />Scho Impact ee: To I $ <br />Calcul ed: Credit: <br />❑Ever- chool Dist Mukilteo Schbol Dist <br />Additional Note <br />/s: <br />- t fC <br />Approved By: Date: <br />0UBLIC'WOR1K8 <br />Intake OK by: Date: <br />M......,.....,...„.....,„.....,.............-............N...........,..,...,.,.......,_,..,......, <br />Intake Comments: IPW Worksheet Needed if.• <br />❑Sys Dev Eval ❑Traffic Mit Eva[ <br />❑Site Work or Drainage Proposed <br />TlBackflow Prevention for high hazard: <br />(dental, medical, animals, mortuary, hospital, <br />;supportive housing) <br />z......,,...,......,.................... ...... ...... ,...............-................... -....................... <br />..„,.....,... <br />❑ Route this folder for PW Review at end --- PW Review Worksheet <br />❑This project also has a separate concurrent PW Review (Green Folder) <br />AND ❑Create Green Folder []Submitted Previously ❑Deferred <br />❑ This Permit is Approved by Public Works <br />❑ See PW Review worksheet and associated attached items <br />❑ A Separate PW Permit is Required (Permit #: PW ) <br />AND ❑ Is located in this folder <br />❑ Is in a Separate Green Folder (join with this folderfor permit issuance) <br />❑ WIII be issued separately (separate Green Folder, PW issued ahead of Bldg) <br />Ea2ublic Works has no scope --- <br />�PWNot Required <br />Additional Notes_�����" <br />[Approved By: Date: <br />