My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
712 91ST PL SE 2022-01-11
>
Address Records
>
91ST PL SE
>
712
>
712 91ST PL SE 2022-01-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2022 8:13:42 AM
Creation date
8/20/2021 8:11:36 AM
Metadata
Fields
Template:
Address Document
Street Name
91ST PL SE
Street Number
712
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2/9/2021 <br />City of Everett <br />6:59:09AM <br />INSPECTION ACTIVITY REPORT <br />8/13/2020 8/13/2020 BLDG KMK APPROVAL as noted <br />I I -INSULATION <br />Page 3 <br />V <br />8/12/2020 4:18 PM Elias Gebrezghi <br />Contact Name: Elias Gebrezghi <br />Site Address: 712 91 ST PL SE <br />Phone:2067692253 <br />e-Mail: elias08O5@iCloud.com <br />(8/13/2020 1:03 PM KMK) <br />Install insulation baffles in attic to protect <br />bird block ventilation before blow in <br />insulation. <br />1/20/2021 1/20/2021 PLUMB 06-FINAL TAHU CORRECTION eTRAKiT Inspection 1/20/2021 4:51 AM Elias Gebrezghi <br />Request <br />Contact Name: Elias Gebrezghi <br />Site Address: 712 91ST PL SE <br />Phone:2067692253 <br />e-Mail: elias08O5@iCloud.com <br />(1/20/2021 3:57 PM TAHU) <br />HWT straps not installed <br />1/20/2021 1/20/2021 GAS 03-FINAL TAHU APPROVAL eTRAKiT Inspection 1/20/2021 4:49 AM Elias Gebrezghi <br />Request <br />Contact Name: Elias Gebrezghi <br />Site Address: 712 91 ST PL SE <br />Phone:2067692253 <br />e-Mail: elias08O5@iCioud.com <br />(1/20/2021 3:57 PM TAHU) <br />Gas fireplace not being installed <br />1/20/2021 1/20/2021 MECH 06-FINAL TAHU CORRECTION eTRAKiT Inspection 1/20/2021 4:48 AM Elias Gebrezghi <br />Request <br />Contact Name: Elias Gebrezghi <br />Site Address: 712 91ST PL SE <br />Phone:2067692253 <br />e-Mail: elias08O5@iCloud.com <br />(1/20/2021 3:57 PM TAHU) <br />Gas fire place not being installed, access to <br />second furnace is not accessible in acttic. <br />see permit M2007-027 <br />1/27/2021 1/27/2021 PLUMB 06-FINAL TAHU APPRVD-PERN eTRAKiT Inspection 1/26/2021 11:09 AM Elias Gebrezghi <br />Request <br />Contact Name: Elias Gebrezghi <br />Site Address: 712 91ST PL SE <br />Phone:2067692253 <br />e-Mail: elias08O5@iCloud.com <br />(1/27/2021 4:08 PM TAHU) <br />HWT straps are completed, Done <br />1/27/2021 1/27/2021 MECH 06-FINAL TAHU APPRVD-PERK eTRAKiT Inspection 1/26/2021 11:15 AM Elias Gebrezghi <br />Request <br />Contact Name: Elias Gebrezghi <br />Site Address: 712 91ST PL SE <br />Phone:2067692253 <br />e-Mail: elias08O5@iCioud.com <br />(1/27/2021 4:08 PM TAHU) <br />Access to furnace in attic is completed. <br />Done <br />INSP12 CAWSYSTE-MS <br />
The URL can be used to link to this page
Your browser does not support the video tag.