My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1515 132ND ST SE 2022-01-20
>
Address Records
>
132ND ST SE
>
1515
>
1515 132ND ST SE 2022-01-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 1:58:00 PM
Creation date
8/20/2021 9:25:55 AM
Metadata
Fields
Template:
Address Document
Street Name
132ND ST SE
Street Number
1515
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BMP C140: Dust Control <br />Purpose <br />Dust control prevents wind transport of dust from disturbed soil surfaces onto roadways, <br />drainage ways, and surface waters. <br />Conditions of Use <br />In areas (including roadways) subject to surface and air movement of dust where <br />on -site and off -site impacts to roadways, drainage ways, or surface waters are <br />likely. <br />Design and Installation Specifications <br />. Vegetate or mulch areas that will not receive vehicle traffic. In areas where plant- <br />ing, mulching, or paving is impractical, apply gravel or landscaping rock. <br />. Limit dust generation by clearing only those areas where immediate activity will <br />take place, leaving the remaining area(s) in the original condition. Maintain the ori- <br />ginal ground cover as long as practical. <br />. Construct natural or artificial windbreaks or windscreens. These may be designed <br />as enclosures for small dust sources. <br />. Sprinkle the site with water until surface is wet. Repeat as needed. To prevent <br />carryout of mud onto street, refer to BMP C105: Stabilized Construction Entrance / <br />Exit (p.270). <br />. Irrigation water can be used for dust control. Irrigation systems should be installed <br />as a first step on sites where dust control is a concern. <br />. Spray exposed soil areas with a dust palliative, following the manufacturer's <br />instructions and cautions regarding handling and application. Used oil is pro- <br />hibited from use as a dust suppressant. Local governments may approve other <br />dust palliatives such as calcium chloride or PAM. <br />. PAM (BMP C126: Polyacrylamide (PAM) for Soil Erosion Protection (p.300)) <br />added to water at a rate of 0.5 lbs. per 1,000 gallons of water per acre and applied <br />from a water truck is more effective than water alone. This is due to increased infilt- <br />ration of water into the soil and reduced evaporation. In addition, small soil <br />particles are bonded together and are not as easily transported by wind. Adding <br />PAM may actually reduce the quantity of water needed for dust control. Use of <br />PAM could be a cost-effective dust control method. <br />Techniques that can be used for unpaved roads and lots include: <br />2014 Stormwater Management Manual for Westem Washington <br />Volume ll - Chapter 4 - Page 310 <br />
The URL can be used to link to this page
Your browser does not support the video tag.