My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1515 132ND ST SE 2022-01-20
>
Address Records
>
132ND ST SE
>
1515
>
1515 132ND ST SE 2022-01-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 1:58:00 PM
Creation date
8/20/2021 9:25:55 AM
Metadata
Fields
Template:
Address Document
Street Name
132ND ST SE
Street Number
1515
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
planned for the project. This type of schedule guides the contractor on work to be done <br />before other work is started so that serious erosion and sedimentation problems can be <br />avoided. <br />Following a specified work schedule that coordinates the timing of land -disturbing activ- <br />ities and the installation of control measures is perhaps the most cost-effective way of <br />controlling erosion during construction. The removal of surface ground cover leaves a <br />site vulnerable to accelerated erosion. Construction procedures that limit land clearing <br />provide timely installation of erosion and sedimentation controls, and restore protective <br />cover quickly can significantly reduce the erosion potential of a site. <br />Design Considerations <br />. Minimize construction during rainy periods. <br />Schedule projects to disturb only small portions of the site at any one time. Com- <br />plete grading as soon as possible. Immediately stabilize the disturbed portion <br />before grading the next portion. Practice staged seeding in order to revegetate cut <br />and fill slopes as the work progresses. <br />II-4.2 Runoff Conveyance and Treatment BMPs <br />This section contains the standards and specifications for Runoff Conveyance and Treat- <br />ment BMPs. Table II-4.2.1 Runoff Conveyance and Treatment BMPs by SWPPP Ele- <br />ment (p.327), below, shows the relationship of the BMPs in II-4.2 Runoff Conveyance <br />and Treatment BMPs to the Construction Stormwater Pollution Prevention Plan <br />(SWPPP) Elements described in II-3.3.3 Step 3 - Construction SWPPP Development <br />and Implementation (p.236). <br />Table 11-4.2.1 Runoff Conveyance and Treatment BMPs by SWPPP <br />memeni <br />Ele- <br />Element <br />Ele- <br />Element <br />Ele- <br />ment <br />#4 <br />Ele- <br />ment <br />#8 Stab- <br />Element <br />ment <br />Element <br />BMP or Ele- <br />#3 <br />Install <br />ment <br />#7 Pro- <br />ilize <br />#9 Con- <br />#10 <br />#13 Protect <br />merit Name <br />Con- <br />Sed- <br />#6 Pro- <br />tect <br />Chan- <br />trot Pol- <br />Control <br />Low Impact <br />trot <br />invent <br />tect <br />Drain <br />nets <br />lutants <br />De- <br />Devel- <br />Flow <br />Con- <br />Slopes <br />and Out <br />Water- <br />opment <br />Rates <br />trolls <br />Inlets <br />lets <br />ing <br />BMP C200: <br />✓ <br />✓ <br />Interceptor <br />Dike and <br />Swale <br />.331 <br />2014 Stormwater Management Manual for Westem Washington <br />Volume 11 - Chapter 4 - Page 327 <br />
The URL can be used to link to this page
Your browser does not support the video tag.