Laserfiche WebLink
Design and Installation Specifications <br />. Use in combination with sediment basins or other BMPs. <br />. Maximum slope steepness (normal (perpendicular) to fence line) 1 H:1 V. <br />. Maximum sheet or overland flow path length to the fence of 100 feet. <br />. Do not allow flows greater than 0.5 cfs. <br />. The geotextile used shall meet the following standards. All geotextile properties lis- <br />ted below are minimum average roll values (i.e., the test result for any sampled roll <br />in a lot shall meet or exceed the values shown in Table II-4.2.3 Geotextile Stand- <br />ards (p.370)): <br />Table II-4.2.3 Geotextile Standards <br />0.60 mm maximum for slit film woven (#30 sieve). <br />Polymeric Mesh AOS <br />0.30 mm maximum for all other geotextile types (#50 sieve). <br />(ASTM D4751) <br />0.15 mm minimum for all fabric types (#100 sieve). <br />Water Permittivity <br />0.02 sec-1 minimum <br />(ASTM D4491) <br />Grab Tensile Strength <br />180 lbs. Minimum for extra strength fabric. <br />(ASTM D4632) <br />100 Ibs minimum for standard strength fabric. <br />Grab Tensile Strength <br />30%maximum <br />(ASTM D4632) <br />Ultraviolet Resistance <br />70% minimum <br />(ASTM D4355) <br />. Support standard strength fabrics with wire mesh, chicken wire, 2-inch x 2-inch <br />wire, safety fence, or jute mesh to increase the strength of the fabric. Silt fence <br />materials are available that have synthetic mesh backing attached. <br />. Filter fabric material shall contain ultraviolet ray inhibitors and stabilizers to provide <br />a minimum of six months of expected usable construction life at a temperature <br />range of 0°F. to 120°F. <br />. One -hundred percent biodegradable silt fence is available that is strong, long last- <br />ing, and can be left in place after the project is completed, if permitted by local reg- <br />ulations. <br />. Refer to Figure II-4.2.12 Silt Fence (p.369) for standard silt fence details. Include <br />the following standard Notes for silt fence on construction plans and specifications: <br />2014 Stormwater Management Manual for Westem Washington <br />Volume ll - Chapter 4 - Page 370 <br />