My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1515 132ND ST SE 2022-01-20
>
Address Records
>
132ND ST SE
>
1515
>
1515 132ND ST SE 2022-01-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 1:58:00 PM
Creation date
8/20/2021 9:25:55 AM
Metadata
Fields
Template:
Address Document
Street Name
132ND ST SE
Street Number
1515
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.0 OFFSITE ANALYSIS <br />Qualitative Analysis <br />A qualitative downstream analysis was performed for the project site. Due to the <br />development surrounding the subject property there is no upstream basin which <br />discharges stormwater runoff to the project site. All available information regarding <br />existing and potential water quality, runoff volumes and rates, flooding and stream bank <br />erosion problems within the study area have been reviewed. Reviewed material included <br />NRSC soil information, City of Everett maps and assessment reports prepared for other <br />projects in the area. See Appendix A for appropriate maps and information. <br />With the proposed development, stormwater will be collected on -site and conveyed East <br />through a 12" pipe to a pond about 100 feet east of the property. Overflow from the <br />pond is conveyed south through 18" and 24" pipes to a drainage ditch. <br />The upstream downstream flow path was followed and observed for 1/4 mile using <br />Snohomish County GIS. Pipe information is displayed in order from upstream to <br />downstream: <br />1) <br />50 <br />feet of 12" <br />0 corrugated metal pipe <br />@ 0.40% <br />2) <br />87 <br />feet of 12" <br />0 corrugated metal pipe <br />@ 1.78% <br />3) <br />134 <br />feet of 12" <br />0 corrugated metal pipe <br />@ 0.12% <br />4) <br />145 <br />feet of 18" <br />0 corrugated metal pipe <br />@ 0.81% <br />5) <br />200 <br />feet of 24" <br />0 corrugated metal pipe <br />@ 0.57% <br />6) <br />70 <br />feet of 24" <br />0 corrugated metal pipe <br />@ 0.96% <br />The five pipe runs mentioned above total a flow path of approximately 679 feet. There <br />were no apparent signs of capacity issues or flooding issues identified in this <br />downstream system. See Appendix A for the downstream map. <br />
The URL can be used to link to this page
Your browser does not support the video tag.