My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1515 132ND ST SE 2022-01-20
>
Address Records
>
132ND ST SE
>
1515
>
1515 132ND ST SE 2022-01-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 1:58:00 PM
Creation date
8/20/2021 9:25:55 AM
Metadata
Fields
Template:
Address Document
Street Name
132ND ST SE
Street Number
1515
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal for Geotechnical Engineering Services <br />Proposed Bank: 1515 132nd Street Southeast, Everett, Washington <br />March 15, 2019 <br />5.2.1 Lateral Resistance <br />Lateral loads on the structure may be resisted by passive earth pressure developed against <br />the embedded portion of the foundation system and by frictional resistance between the <br />bottom of the foundation and the supporting subgrade soils. For footings bearing on the <br />dense to very dense silty sand, a frictional coefficient of 0.35 may be used to evaluate <br />sliding resistance developed between the concrete and the subgrade soil. Passive soil <br />resistance may be calculated using an equivalent fluid weight of 350 pcf, assuming <br />foundations are backfilled with structural fill. The above values include a factor of safety <br />of 1.5. Unless covered by pavements or slabs, the passive resistance in the upper 12 inches <br />of soil should be neglected. <br />5.2.2 Perimeter Footing Drains <br />Footing drains should be installed around the perimeter of the building, at or just below the <br />invert of the footings. Under no circumstances should roof downspout drain lines be con- <br />nected to the footing drain systems. Roof downspouts must be separately tightlined to <br />appropriate discharge locations. Cleanouts should be installed at strategic locations to <br />allow for periodic maintenance of the footing drain and downspout tightline systems. <br />5.2.3 Footing Subgrade Preparation <br />Our test borings encountered 3 to 41/z feet of fill below the site. The fill is loose and would <br />not be suitable for direct support of foundation loads. If fill is encountered at the foundation <br />subgrade elevation, the fill should be overexcavated and replaced with structural fill. The <br />overexcavation width should extend at least one half the overexcavation depth beyond the <br />width of the foundation elements. <br />All footing subgrade should be properly prepared and in a dense and unyielding condition <br />prior to setting forms and placing reinforcing steel. Any loose or softened soil should be <br />removed from the footing excavations. The adequacy of the footing subgrade soils should <br />be verified by a representative of PanGEO, prior to placing forms or rebar. <br />5.3 FLOORS SLABS <br />The floor slabs for the proposed building may be constructed using conventional concrete <br />slab -on -grade floor construction. The floor slab should be supported on competent native <br />19-049 1515 132nd St SE Page 7 PanGEO, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.