Laserfiche WebLink
CIVIL ENGINEERING 0 SURVEYING 0 LAND PLANNING <br />May 30, 2019 <br />City of Everett Engineering and Permitting Services <br />3200 Cedar Street, 2nd floor <br />Everett, WA 9201 <br />Attention: Thad Newport <br />P.O.. Box 949, Gig Harbor, WA 98335 <br />4706 9r St. NW, Suite 100 <br />Gig Harbor, WA 98332 <br />Phone: 253-857-5454 <br />Fax: 253-509-0044 <br />Email: info6contoumlic.com <br />Re: Permit# PW1903-075,1515132NO Street Development Demolition Plan <br />Dear Thad, <br />We have revised the demolition plans based on the City of Everett's review comments received May <br />24, 2019. The following are our responses to the comments on the redlined plans. <br />Sheet D2 <br />1. Plug and grout MH at inlet of abandoned pipe. <br />This is now specified on Sheet D2. <br />2. 92 D3 <br />Sheet D3 is now referenced on both callouts. <br />3. Plug & grout catch basin inlet of removed pipe. <br />F 6 <br />This is now specified on Sheet D2.Ll <br />�k <br />4. Doesn't this pipe need to remain for restaurant?CIT <br />�' ' <br />Y op <br />This pipe is now not specified as being removed. P <br />ermit ' e <br />5. Note: Demolished asphalt or concrete areas to be replaced with permanent patch (not gravel). <br />See Pavement Replacement Note, Sheet D2 <br />Sheet D3 <br />6. Note: Tank removal to follow ecology guidelines and requirements for UST. <br />See Underground Storage Tank Note, Sheet D3. <br />