My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1515 132ND ST SE 2022-01-20
>
Address Records
>
132ND ST SE
>
1515
>
1515 132ND ST SE 2022-01-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 1:58:00 PM
Creation date
8/20/2021 9:25:55 AM
Metadata
Fields
Template:
Address Document
Street Name
132ND ST SE
Street Number
1515
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal for Geotechnical Engineering Services <br />Proposed Bank: 1515 132nd Street Southeast, Everett, Washington <br />March 15, 2019 <br />In our opinion, the predominately silty sand and silt soils underlying the site are not suitable <br />for use as wall backfill. <br />Wall backfill should be moisture conditioned to within about 3 percent of optimum <br />moisture content, placed in loose, horizontal lifts less than 8 inches in thickness, and <br />systematically compacted to a dense and relatively unyielding condition and to at least 95 <br />percent of the maximum dry density, as determined using test method ASTM D-1557. <br />Within 5 feet of the wall, the backfill should be compacted with hand -operated equipment <br />to at least 90 percent of the maximum dry density. <br />5.5 PERMANENT CUT AND FILL SLOPES <br />Based on the anticipated soil that will be exposed in the planned excavation, we <br />recommend permanent cut and fill slopes be constructed no steeper than 2H:1V <br />(Horizontal: Vertical). <br />6.0 EARTHWORK CONSIDERATIONS <br />6.1 STRIPPING, CLEARING AND SUBGRADE PREPARATION <br />Foundation and pavement areas, and areas to receive structural fill, should be stripped and <br />cleared of surface vegetation, organic matter, existing pavements, and other deleterious <br />materials. In no case should stripped materials be used as structural fill nor should they be <br />mixed with materials to be used as structural fill. Outside of construction areas, the existing <br />site pavement may be left in -place to provide an all-weather construction surface. <br />In areas where existing foundations, slab -on -grade floors, and pavements are removed, it may <br />be possible to crush the existing materials for re -use as structural fill. Materials reclaimed by <br />crushing to be re -used as structural fill should have a maximum particle size of four inches <br />and should be mixed with soil to provide a well -graded fill material. <br />Existing underground utilities to be abandoned should be plugged or removed so they do not <br />provide a conduit for water and cause soil saturation and stability problems. <br />Following the stripping operation and excavations necessary to achieve construction <br />subgrade elevations, the ground surface where structural fill, or pavements are to be placed <br />should be observed by PanGEO. Proofrolling using a fully loaded dump truck should be <br />performed to identify soft or unstable areas. <br />19-049 1515 132nd St SE Page 10 PanGEO, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.