My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1515 132ND ST SE 2022-01-20
>
Address Records
>
132ND ST SE
>
1515
>
1515 132ND ST SE 2022-01-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 1:58:00 PM
Creation date
8/20/2021 9:25:55 AM
Metadata
Fields
Template:
Address Document
Street Name
132ND ST SE
Street Number
1515
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />GIN EERI N G• L L C <br />CONSTRUCTION STORMWATER <br />POLLUTION PREVENTION PLAN <br />(SWPPP) <br />FOR <br />1515132ND STREET DEVELOPMENT <br />CITY OF EVERETT, WASHINGTON <br />OCTOBER 2019 <br />Prepared For: <br />tao <br />Tekin & Associates, LLC <br />2600 N Dallas Parkway, Ste 3 <br />0- <br />Frisco, Tx 75034 <br />m <br />L <br />w <br />s <br />a <br />M. <br />Prepared By: <br />3ames M. Rausch, EXT., Design <br />z <br />4-1 <br />Engineer <br />J o <br />U <br />a <br />�+ <br />m <br />LU <br />E , <br />Approved By: <br />Z = ,� <br />g ? Z <br />Brett M. Allen, P.E., Principal <br />� <br />�r <br />a <br />o <br />P.O. Box 94994 <br />d Q o <br />i <br />Gig Harbor, WA 98335 <br />a-,� <br />�, v4-1 <br />V1 <br />NAL� <br />(253) 857-5454 <br />0 <br />�' <br />Project # 18-178 <br />4�Qv MLon <br />v 1i o <br />v <br />U <br />0-(n0 <0-0 <br />I hereby state that this Construction Stormwater Pollution Prevention Plan for 1515132YD STREET DEVELurwrivT nas oe errprepareu oy <br />me or under mysurpefwsion and meets the standard of care and expertise that is usual and customary in this community ofprofessional <br />engineers 1 understand that the City of Evetett does not and will not assume liability for the sutirdency, sultabillty or pen°ormance of <br />drainage facilities prepared by Contour Engineering LLC This analysis is based on data and records elthersupplled to, or obtained by, Contour <br />Englneeft, LLC. These documents are referenced within the text of the analysis: The analysis has been prepared utilizing procedures and <br />practices within the standard accepted practices of the industry. <br />
The URL can be used to link to this page
Your browser does not support the video tag.