My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3120 HEWITT AVE ALLIED CONSTRUCTION 2018-01-02 MF Import
>
Address Records
>
HEWITT AVE
>
3120
>
ALLIED CONSTRUCTION
>
3120 HEWITT AVE ALLIED CONSTRUCTION 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2022 10:25:38 AM
Creation date
8/25/2021 8:08:04 AM
Metadata
Fields
Template:
Address Document
Street Name
HEWITT AVE
Street Number
3120
Tenant Name
ALLIED CONSTRUCTION
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 <br />1214/2012 City of Everett <br />3:07:54PNI <br />INSPECTION ACTIVITY REPORT <br />Permit No. B1112-030 <br />Site Address 3120 HEWIIT AVE <br />Applied 1228/1011 <br />Appnwed 2/102012 <br />Issued 2/102012 <br />Applicant <br />Owner <br />Contractor <br />Lot <br />ALLIED CONSTRUCTION ASSOC Block <br />ALLIED CONSTRUCTION Tract <br />Parent Permit No. PW1202.006 <br />Description <br />Noes <br />T.1.- ALLIED CONSTRUCTION- IST FLR <br />LANDSCAPE INSP REQ PRIOR TO FINAL -CALL TERESA FIRNST UiL 425-257-7281 <br />OFFICES 8: MEZZANINE <br />Scheduled Comnleted Tyne Insncctor Result Remarks InSDeelor's Comments <br />4252012 4125201'_ Fnmin{: DII'1' Approval As per notes Inspected column footings--approv d as per beam <br />and <br />as noted: <br />I Remove waer before pour concrete <br />6/72012 6172012 Framin^ MW11 1'anialApproe31 See notes I. Fire stop and draft stop <br />2. Minimum stair tread depth - I I" <br />Ok to drywall <br />6/82012 <br />6/122012 <br />W 15201_ <br />W811012 <br />0/12/1012 <br />DrywallNwling <br />Framing <br />Consultation <br />MWII <br />MWH <br />MII•II <br />PanialAppros'a] <br />Approval <br />Ist floor only <br />draft stops I fire <br />stops <br />See notes <br />1. North side landing at front entrance <br />required 36" deep <br />2 Hand rails on both sides -no extensions <br />3. Landinchcieh17"mac <br />Above are special conditions per site layout <br />7/192012 <br />7/19/2012 <br />Consultation <br />b111'H <br />Other <br />Pre -final - see notes <br />I. Railines to 2nd stop <br />2_ Marking at from entrance stairs <br />3. 27" barrier at stairs <br />7202012 <br />720/2012 <br />StatusReview <br />DLW <br />See notes <br />(1 N 72012 2.491'M LLW) <br />Temporary CO.OK to move in - upstairs <br />needs finishing <br />7202012 <br />7202012 <br />Final Bldg <br />M11T1 <br />PanialApproeal <br />Partirary <br />notes al FnaFSee <br />Certificate of <br />Ok for Occup ncm�ffi a furniture and Allied <br />Workers <br />9/132012 <br />9/13/2012 <br />StatusReview <br />TMF <br />Approval <br />Finai Planning <br />uk-landscaping <br />planted <br />9272012 <br />9272012 <br />StatusReview <br />DUtl <br />See notes <br />(I IP_72012 2:55 PM LL111 <br />Final Certificate ofOecupnc)' <br />INSP12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.