Laserfiche WebLink
PUBLIC WORK <br />t"140 W W� <br />#7 <br />Paving <br />AC Pavement Patching (includes <br />removal of old pavement) <br />S.Y. <br />12.00 <br />4 Inch Crushed Rock <br />S.Y. <br />I i cf <br />4.00 <br />6 Inch Crushed Rock <br />S.Y. <br />6.00 <br />2 Inch Class 6 <br />S.Y. <br />4.00 <br />3 Inch Class B <br />S.Y. <br />6.00 <br />4 Inch Class B <br />S.Y. <br />I <br />8.00 <br />? <br />Bank Run Gravel, 3- (screened In <br />place <br />C.Y. <br />7.50 <br />5/8N Crushed Rock, In Place <br />C.Y. <br />15.00 <br />Saw Cut AC Pavement <br />Ft. <br />2.00 <br />Other <br />Other <br />Paving Total: S <br />Curb & Gutter <br />Curb & Gutter <br />L.F. <br />9.00 <br />Other <br />Curb & Gutter Total: <br />MjjpppR%EST PfRMrT FEE CALC 141, <br />