Laserfiche WebLink
INSPECTION REPORT <br />(gL77- <br />Dater Permit:J! 1�-� r� <br />Contractor: <br />Owner: <br />Site Address <br />TYPE OF INSPECTION REQUESTED <br />ELECTRICAL BUILDING MECHANICAL PLUMBING <br />❑ Temp Service ❑ LIFER ground ❑ Groundwork/Stab ❑ Groundwork/Slab <br />❑ Groundwork ❑ Footing ❑ Rough In ❑ Rough In <br />❑ Slab/Conduit ❑ Foundation ❑ Ceiling Grid ❑ Ceiling Grid <br />❑ Rough in ❑ Structural Slab ❑ OK to insulate ❑ OK to insulate <br />❑ Service ❑ framing poftop Units ❑ Water Service <br />❑ Grounding ❑Insulation 1 ' echanical Final El Medical Gas <br />El Ceiling Grid El Drywall Nailing ❑ Plumbing Final <br />❑ Electrical Final ❑ Shear Nailing GAS PIPE <br />SITE WORK ❑ Roof Nailing ❑ Rough In/service Hot Water Tank <br />❑ Footing drains ❑ Ceiling Grid ❑ Refrigeration ❑ Rough In <br />❑ Roof drains ❑ Building Final ❑ Gas Pipe Final ❑ HWT Final <br />OTHER OR CONSULIAI IUN: <br />APPROVAL ❑PARTIAL AP PR OVAL FINAL APPROVAL THIS PER <br />❑ OR T.C.O. ❑ CORRECTION REQUESTED <br />❑ OK FOR C.O. ❑ VIOLATION <br />❑ UNABLE TO PERFORM INSPECTIO14: <br />❑ CALL (425) 257.8881 FOR REINSPECTION • 24 hour notice required <br />Inspector: <br />rntlao�I�usc <br />Dole: <br />�w.�.,�•. ,�������,...::�„e�w.� <br />