Laserfiche WebLink
Administrator. Unit 9 must be cable logged with minimum lead-end suspension except with <br /> written permission by Contract Administrator. <br /> H-140 Special Yarding Requirements <br /> Purchaser shall accomplish the following during the yarding operations: <br /> (a) All old growth stumps and logs and blowdown trees that do not have small <br /> branches shall be left undisturbed as much as possible. <br /> (b) Shovel roads shall be located to avoid brushy areas, old down logs, and <br /> marked leave tree clumps. <br /> I Shovel logging shall be done in accordance with the City of Everett Shovel <br /> Logging Specifications dated 6/1/2011 (see below) and incorporated herein <br /> by reference. <br /> (d) Purchaser must comply with the following specification during yarding: <br /> (i) Skid trails will not exceed 15 feet in width, including rub trees. <br /> (ii) Deviations from designated skid trail locations must be pre-approved <br /> by the Contract Administrator. <br /> (iii) Trees within skid trails shall be felled and yarded prior to the felling <br /> of adjacent timber. <br /> (iv) Excessive skid trail damage is not permitted. Skid trail damage is <br /> considered excessive when more than 10 percent of the active trail has <br /> ruts over 4 inches in depth. <br /> (v) Skid trails will be water barred at the time of completion of yarding, if <br /> required by the Contract Administrator. <br /> (vi) Rub trees along the skid trail shall be left standing until all timber <br /> tributary to the skid trail has been removed. <br /> (e) Wet areas shall be crossed in only one location and must be pre-approved by <br /> the Contract Administrator. Trees around the wet areas shall be felled away <br /> from these areas. <br /> (f) All trees marked with blue paint shall be left standing. If any tree marked with <br /> blue paint must be felled due to safety or operational reasons, they may be <br /> felled but must be left un-bucked on site. Permission to do otherwise must be <br /> granted in writing by the Contract Administrator. <br /> H-190 Completion of Settings <br /> Operations begun on any setting of the sale area shall be completed before any operation <br /> begins on subsequent settings unless authorized in writing by the Contract Administrator. <br /> }1-220 Protection of Residual or Adjacent Trees <br /> Page 22 of 34 <br /> 4/15/21 Agreement No.2021-01 <br />