My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sierra Pacific Industries 8/16/2020
>
Contracts
>
6 Years Then Destroy
>
2023
>
Sierra Pacific Industries 8/16/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2021 12:00:10 PM
Creation date
8/27/2021 11:56:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sierra Pacific Industries
Approval Date
8/16/2020
Council Approval Date
8/4/2021
End Date
9/30/2023
Department
Public Works
Department Project Manager
Anna Thelen
Subject / Project Title
Chaplain Gap Timber Sale
Tracking Number
0003030
Total Compensation
$5,088,424.00
Contract Type
Agreement
Contract Subtype
Purchase
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. In the event of repair or routine maintenance such as oil changes or adjustment of <br /> hydraulic gear, equipment shall be moved to a designated storage and maintenance <br /> location agreed to by City's Contract Administrator. <br /> 13. Particular attention shall be given to housekeeping practices in the watershed. The <br /> area shall be kept free of trash, oily rags, empty containers etc. All extraneous or <br /> partially full containers of petroleum products or other chemicals shall be removed <br /> from the watershed at the end of each day. <br /> 14. Sanitary facilities provided by the City and rubbish containers provided by the <br /> Purchaser shall be located at all work sites and all locations where workers gather <br /> prior to start of work or shift changes. Sanitary facilities shall be maintained by the <br /> City in a clean and sanitary condition and shall be serviced regularly to prevent <br /> spillage or undue odors.All personnel shall be required to exclusively use the sanitary <br /> facilities. Notice shall be given that offenders will be dismissed and shall not be <br /> rehired for work on this Contract. Rubbish containers will have watertight lids, will <br /> be lined with plastic and will not be permitted to overflow. Whenever possible, <br /> sanitary facilities and rubbish containers shall be located, so that should a spill occur, <br /> it will drain away from the Reservoir. <br /> 15. Stockpiles of construction materials such as explosives and other potential pollutants <br /> shall be stored and protected from the effects of weather and surface runoff. <br /> B. Earthwork. <br /> 1. The Purchaser shall exercise judgment and skill in carrying out all earthwork-related <br /> activities due to the turbidity threat they pose to water quality.All work shall be within <br /> accepted standards of good practice for environmentally sensitive locations and as <br /> specified. <br /> 2. Constructed slopes whether temporary or permanent shall be constructed as shown on <br /> the Road Plan and/or as dictated by safe practice. <br /> 3. The Purchaser shall conduct work activities under the premise than an intense <br /> precipitation event can occur at any time and preventive measures should be taken to <br /> protect against erosion. Temporary erosion control shall be installed prior to start of <br /> earthwork activities. <br /> 4. Drainage shall be arranged to avoid concentration of runoff.Preference shall be given <br /> to longer, less direct drainage paths to existing waterways utilizing overland flow <br /> through undisturbed areas. <br /> C. Emergency Response. <br /> 1. Any condition causing or threatening to cause chemicals,petroleum products or large <br /> amount of turbid water to enter the Reservoir or natural streams, or an accident such <br /> as a vehicle entering the Reservoir will be considered an emergency condition and <br /> actions to stop or remove the violating conditions shall be taken immediately. <br /> Page 27 of 34 <br /> 4/15/21 Agreement No.2021-01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.