Laserfiche WebLink
Chaplain Gap Timber Sale <br /> ROAD CLAUSES <br /> SECTION 0-SCOPE OF PROJECT <br /> 0-1 ROAD PLAN SCOPE: Clauses in this road plan apply to all road-related work,including landings and rock <br /> source development, unless otherwise noted, permitted through FPA#'s 2817134, 2817867, and 2817914. <br /> All requirements of these permits shall follow Forest Practice Rules. <br /> 0-2 REQUIRED ROADS:The specified work on the following roads is required. <br /> ROAD STATIONS ACTION <br /> 1A 12+50 CONSTRUCT <br /> 1B 2+00 CONSTRUCT <br /> 3A 1+60 CONSTRUCT <br /> 3B 1+60 CONSTRUCT <br /> 3C 1+50 CONSTRUCT <br /> 4A 1+65 CONSTRUCT <br /> 5A 2+10 CONSTRUCT <br /> 6A 1+00 CONSTRUCT <br /> 6B 1+50 CONSTRUCT <br /> 7A 17+15 CONSTRUCT <br /> 7B 2+70 CONSTRUCT <br /> 7C 1+50 CONSTRUCT <br /> 7D 1+30 CONSTRUCT <br /> 9A 4+75 CONSTRUCT <br /> 10A 9+80 CONSTRUCT <br /> T-1240 B 2+30 CONSTRUCT <br /> T-1000 JCT 0+50 CONSTRUCT <br /> D-1460 10+00 MAINTENANCE <br /> HB-ML Seg.2 70+00 MAINTENANCE <br /> D-1000 20+00 MAINTENANCE <br /> C-1300 1+80 MAINTENANCE <br /> C-1330 7+40 MAINTENANCE <br /> HB-ML 20+00 MAINTENANCE <br /> LL-ML 214+00 MAINTENANCE <br /> T-1240 25+00 MAINTENANCE <br /> T-1200 43+00 MAINTENANCE <br /> T-1000 102+00 MAINTENANCE <br /> 0-4 CONSTRUCTION: Construction includes, but is not limited to clearing, grubbing, excavation and <br /> embankment to sub-grade,full bench end-haul,landing and turnout construction,culvert installation,bridge <br /> installation,culvert removal,geotextile installation,drill and shoot,application of 3-inch-minus ballast rock <br /> or gravel ballast. <br />