My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sierra Pacific Industries 8/16/2020
>
Contracts
>
6 Years Then Destroy
>
2023
>
Sierra Pacific Industries 8/16/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2021 12:00:10 PM
Creation date
8/27/2021 11:56:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sierra Pacific Industries
Approval Date
8/16/2020
Council Approval Date
8/4/2021
End Date
9/30/2023
Department
Public Works
Department Project Manager
Anna Thelen
Subject / Project Title
Chaplain Gap Timber Sale
Tracking Number
0003030
Total Compensation
$5,088,424.00
Contract Type
Agreement
Contract Subtype
Purchase
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chaplain Gap Timber Sale <br /> c.Percent of purity <br /> d.Percentage of germination <br /> e.Percentage of weed seed and inert material <br /> 5.Seed shall conform to the following mixture: <br /> Kind and Variety of Seed in %by <br /> Mixture Weight <br /> Annual Ryegrass 50 <br /> Winter Triticale 50 <br /> SECTION 9 POST HAUL ROAD WORK <br /> 9-3 REMOVAL OF CULVERT MATERIAL FROM CITY LAND:Culvert material removed from roads <br /> becomes the property of the Purchaser and must be removed from City land. <br /> 9-10 LANDING DRAINAGE:Purchaser shall provide for drainage of the landing surface as approved,in <br /> writing,by the Contract Administrator. <br /> 9-12 LANDING EMBANKMENT REMOVAL:The Purchaser shall reduce or relocate landing embankment,in <br /> a manner approved,in writing,by the Contract Administrator.Excavated material shall be placed in a <br /> waste area designated by the Contract Administrator. <br /> 9-21 ROAD ABANDONMENT:The following road(s)shall be abandoned by the Purchaser before the <br /> termination of this contract. <br /> ROAD STATIONS <br /> 3A 0+00 to 1+60 <br /> 3B 0+00 to 1+60 <br /> 3C 0+00 to 1+50 <br /> 4A 0+00 to 1+65 <br /> 5A 0+00 to 2+10 <br /> 6A 0+00 to 1+00 <br /> 6B 0+00 to 1+50 <br /> 7C 0+00 to 1+50 <br /> 7D 0+00 to 1+30 <br /> C-1330 0+00 to 7+40 <br /> 9-22 ABANDONMENT: <br /> • Remove all ditch relief culverts.The resulting slopes shall be 1:1 or flatter.The removed fill material <br /> shall be placed and compacted in a location that will not erode into any Typed waters or wetlands. <br /> • Remove all culverts in natural drainages.The resulting slopes shall be 1:1 or flatter.Strive for <br /> matching the existing native stream bank gradient.The natural streambed width shall be re-established. <br /> The removed fill material shall be placed and compacted in a location that will not erode into any <br /> Typed waters or wetlands. <br /> • Transport all removed culverts off site.All removed culverts shall become the property of the <br /> Purchaser. <br />
The URL can be used to link to this page
Your browser does not support the video tag.