My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sierra Pacific Industries 8/16/2020
>
Contracts
>
6 Years Then Destroy
>
2023
>
Sierra Pacific Industries 8/16/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2021 12:00:10 PM
Creation date
8/27/2021 11:56:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sierra Pacific Industries
Approval Date
8/16/2020
Council Approval Date
8/4/2021
End Date
9/30/2023
Department
Public Works
Department Project Manager
Anna Thelen
Subject / Project Title
Chaplain Gap Timber Sale
Tracking Number
0003030
Total Compensation
$5,088,424.00
Contract Type
Agreement
Contract Subtype
Purchase
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chaplain Gap Timber Sale <br /> ROAD# 1A 1B 3A 3B 3C 4A 5A 6A 6B 7A <br /> REQUIRED/OPTIONAL REQUIRED REQUIRED REQUIRED REQUIRED REQUIRED REQUIRED REQUIRED REQUIRED REQUIRED REQUIRED <br /> CONSTRUCT/RECONSTRUCT CONSTRUCT CONSTRUCT CONSTRUCT CONSTRUCT CONSTRUCT CONSTRUCT CONSTRUCT CONSTRUCT CONSTRUCT CONSTRUCT <br /> TOLERANCE CLASS(A/B/C) C C C C C C C C C C <br /> STATION 0+00 0+00 0+00 0+00 0+00 0+00 0+00 0+00 0+00 0+00 <br /> TO <br /> STATION 12+50 2+00 1+60 1+60 1+50 1+65 2+10 1+00 1+50 17+15 <br /> ROAD WIDTH R 12 12 12 12 12 12 12 12 12 12 <br /> CROWN(INCHES©C/L) 3 3 3 3 3 3 3 3 3 3 <br /> DITCH WIDTH W 3 3 3 3 3 3 3 3 3 3 <br /> DITCH DEPTH D 1 1 1 1 1 1 1 1 1 1 <br /> TURNOUT LENGTH L 50 50 50 50 50 50 50 50 50 50 <br /> TURNOUT WIDTH T 10 10 10 10 10 10 10 10 10 10 <br /> TURNOUT TAPER P 25 25 25 25 25 25 25 25 25 25 <br /> GRUBBING G1 5 5 5 5 5 5 5 5 5 5 <br /> G2 5 5 5 5 5 5 5 5 5 5 <br /> CLEARING C1 10 10 10 10 10 10 10 10 10 10 <br /> C2 10 10 10 10 10 10 10 10 10 10 <br /> ROCKFILLSLOPE K:1 1% 11 1% 1% 1% 1% 1% 1,4 1% 11 <br /> BALLAST DEPTH' B1 12 12 12 12 12 12 12 12 12 12 <br /> CUBIC YARDS/STATION 44 44 44 44 44 44 44 44 44 44 <br /> TOTAL CUBIC YARDS BALLAST' 556 89 71 71 67 73 93 44 67 762 <br /> SURFACING DEPTH' B2 / <br /> CUBIC YARDS/STATION <br /> TOTAL CUBIC YARDS SURFACING' / // // ---- - <br /> TOTAL CUBIC YARDS' 556 89 71 71 67 73 93 44 67 762 <br /> SUBGRADE WIDTH S 15 15 15 15 15 15 15 15 15 15 <br /> BRUSHCUT(Y/N) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A <br /> BLADE,SHAPE&DITCH(Y/N) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A <br /> 'Specified rock depth is FINISHED COMPACTED DEPTH in inches. <br /> 2 Specified rock quantity is LOOSE MEASURE(Truck Cubic Yards)needed to accomplish specified FINISHED <br /> COMPACTED DEPTH.Rock quantities include volume for turnouts,curve widening,and landings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.