My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sierra Pacific Industries 8/16/2020
>
Contracts
>
6 Years Then Destroy
>
2023
>
Sierra Pacific Industries 8/16/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2021 12:00:10 PM
Creation date
8/27/2021 11:56:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sierra Pacific Industries
Approval Date
8/16/2020
Council Approval Date
8/4/2021
End Date
9/30/2023
Department
Public Works
Department Project Manager
Anna Thelen
Subject / Project Title
Chaplain Gap Timber Sale
Tracking Number
0003030
Total Compensation
$5,088,424.00
Contract Type
Agreement
Contract Subtype
Purchase
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chaplain Gap Timber Sale <br /> MATERIAL LIST <br /> LOCATION CULVERT DOWNSPOUT RIPRAP REMARKS <br /> T <br /> -I Note:Galvanized metal culverts shall conform to the following specifications for gage and corrugation as a <br /> c r Or- function of diameter. <br /> O r a- m 0 m <br /> n m z m z ? < < > Diameter Gage Corrugation <br /> ROAD# STATION =m m G) -o m 0 -o <'LT, <r -o v <br /> m-I -4- m -- m » >m m m C> 18" 16 2%"x''A" <br /> u)7 — <br /> _ —= 7 0� m 24"-48" 14 2%"xW <br /> n o) 54"-96" 14 3"x 1" <br /> 1A 0+10 18 40 XX 2 3 L NT % <br /> 3+10-5+00 /r / Excavation-Cut and fill on side slope. <br /> 7+20 18 30 XX 2 3 L NT C <br /> 1B 0+10 18 40 XX /� 2 3 L NT C <br /> 3C 0+22 18 40 XX // 2 3 L NT C <br /> 4A 0+16 18 40 XX ____,..------1/ 2 3 L NT C <br /> 5A 0+35 18 40 XX �,.,„../-- 2 3 L NT C <br /> 7A 10+00 18 30 XX �____.-------- 2 3 L NT C <br /> 7C 0+40 18 40 XX /__._.-/--.4 2 3 L NT C <br /> 7D 0+15 18 40 XX �__._..------- 2 3 L NT C <br /> 10A 4+50 18 30 XX /� 2 3 L NT C <br /> T-1240 1+41 18 30 XX 2 3 L NT C <br /> 13+17 18 30 XX 2 3 L NT C <br /> T-1240 B 0+20 18 40 �/ 2 3 L NT C <br /> HB-ML 0+19 18 40 XX ____.----- / 2 3 L NT C <br /> C-1330 0+70 18 40 XX ______/-- 2 3 L NT C <br /> 4+90 18 30 XX � 2 3 L NT C <br /> C-1300 0+15 18 60 XX �� 2 3 L NT C <br /> D-1460 5+00 24 30 XX // 5 7 UH NT C <br /> GM-Galvanized Metal PS-Polyethylene Single Wall AM-Aluminized Metal C-Concrete XX-PD or GM <br /> H-Heavy Loose Riprap PD-Polyethylene Dual Wall L-Light Loose Riprap NT-Native(Bank Run) QS-Quarry Spalls <br />
The URL can be used to link to this page
Your browser does not support the video tag.