My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sierra Pacific Industries 8/16/2020
>
Contracts
>
6 Years Then Destroy
>
2023
>
Sierra Pacific Industries 8/16/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2021 12:00:10 PM
Creation date
8/27/2021 11:56:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sierra Pacific Industries
Approval Date
8/16/2020
Council Approval Date
8/4/2021
End Date
9/30/2023
Department
Public Works
Department Project Manager
Anna Thelen
Subject / Project Title
Chaplain Gap Timber Sale
Tracking Number
0003030
Total Compensation
$5,088,424.00
Contract Type
Agreement
Contract Subtype
Purchase
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> CHAPLAIN BRIDGE INSTALLATION DETAILS,SPECIFICATIONS,AND REQUIREMENTS <br /> SPECIAL PROVISIONS FOR <br /> 4.25-INCH STEEL BRIDGE DECKED MODULAR BEAM BRIDGE(S) <br /> 1.0 BRIDGE LOCATION AND GENERAL REQUIREMENTS <br /> On the following road,the Purchaser shall design,fabricate,deliver and install each bridge,listed below,in <br /> accordance with this road plan and attached bridge site construction drawings. <br /> Road Station Length' W.B.S.R.2 Loading/ Type <br /> (ft.) (ft.) Deflection <br /> Ratio <br /> Diversion 1+00 to 45'8"* 14' 1/500 Modular Steel Bridge: <br /> Dam-D- 2+00 <br /> 1000 Shop assembled,steel,two-piece, <br /> portable,modular bridge <br /> superstructure complete with a curb or <br /> rail system and precast concrete <br /> footings. Design must include a full <br /> width,continuous deck with no gaps <br /> that allow water and sediment to drain <br /> from the bridge to the stream. See <br /> installation and construction details on <br /> project bridge site construction <br /> drawings. <br /> 'The total length of the superstructure shall be measured from out to out including sills and end angles. <br /> 2W.B.S.R. = Width between shear rails. <br /> 1.1 Scope of Bridge Structure <br /> These specifications are for fully engineered multi-piece modular bridge(s)of steel construction <br /> with Big R 4.25-Inch Steel Bridge Deck and shall be regarded as minimum standards for design <br /> and construction.The work included under this item shall consist of design,fabricating,finishing <br /> and transporting the steel modular beam bridge superstructure(s)including bearings. These <br /> specifications are based on products designed and manufactured by Big R Bridge. <br /> 1.2 Definitions <br /> Owner: City of Everett,Everett,Washington <br /> Engineer: Gael Fisk,P.E.-Associate Engineer <br /> Contractor: Entity who will install and/or purchase the bridge. <br /> Bridge Manufacturer: Firm supplying the bridge in accordance with these Special Provisions. <br /> 1.3 Qualification of Bridge Manufacturer <br /> Each Contractor is required to identify their intended supplier as part of the bid submittal. <br /> Qualified Bridge Manufacturers must have at least 5 years' experience fabricating these types of <br /> structures and shall have an up to date certification by AISC as a Certified Bridge Fabrication- <br /> Intermediate(Major)with Fracture Critical Endorsement.All suppliers shall fabricate their <br />
The URL can be used to link to this page
Your browser does not support the video tag.