My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sierra Pacific Industries 8/16/2020
>
Contracts
>
6 Years Then Destroy
>
2023
>
Sierra Pacific Industries 8/16/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2021 12:00:10 PM
Creation date
8/27/2021 11:56:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sierra Pacific Industries
Approval Date
8/16/2020
Council Approval Date
8/4/2021
End Date
9/30/2023
Department
Public Works
Department Project Manager
Anna Thelen
Subject / Project Title
Chaplain Gap Timber Sale
Tracking Number
0003030
Total Compensation
$5,088,424.00
Contract Type
Agreement
Contract Subtype
Purchase
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> CHAPLAIN BRIDGE INSTALLATION DETAILS,SPECIFICATIONS,AND REQUIREMENTS <br /> Submittals shall be sent to: <br /> Roots Forestry Consulting,LLC <br /> Attn.:Travis J.Miranda <br /> 16102 4th Ave NW Arlington,WA 98223 <br /> 360-631-7606 <br /> TMiranda@everettwa.gov <br /> Reports and plans will be accepted or rejected within 30 working days of receipt.Delays in work <br /> because of the possibility of rejection,revision,and resubmittal of documents are deemed a risk of <br /> the Purchaser and shall not be the basis for claims of additional compensation.Within 15 working <br /> days of final acceptance,Purchaser shall submit two complete sets of finalized plans to <br /> the Project Engineer(Gael Fisk)and one to the Contract Administrator(Travis Miranda).Any <br /> omissions to the plans shall be the responsibility of the Purchaser to correct and resubmit a <br /> finalized set of plans. <br /> 1.6 Structure Acceptance <br /> The City's engineer,or designee,will inspect the structure after it has been fabricated and <br /> delivered in accordance with the specifications contained herein and after all required <br /> certifications have been furnished. <br /> 2.0 APPLICABLE CODES AND STANDARDS <br /> 2.1 Governing Specifications <br /> Bridge(s)shall be designed in compliance with the LRFD Bridge Design Specifications,latest <br /> edition,by AASHTO. Calculations shall be in accordance with this document,and formulas shall <br /> reference the appropriate sections. <br /> 2.2 Other Reference Codes,Specifications and Standards <br /> AISC,Steel Construction Manual,Latest Edition <br /> American Welding Society,Structural Welding Code,D1.5,Latest Edition <br /> ASCE/SEI 7 Min.Design Loads for Buildings and Other Structures,Latest Ed. <br /> National Design Specification for Wood Construction,ANSI NDS-Latest Edition <br /> 3.0 BRIDGE GEOMETRY <br /> 3.1 Span Length <br /> 3.1.1 The bridge span shall be configured so as to provide a clear span dimension from the <br /> inside face to inside face of sill of 35'-0"(straight line dimension). The bridge <br /> manufacturer shall determine final out-to-out of the bridge span.See attached <br /> construction site plans and sections for general layout of bridge deck and dimensions. <br /> 3.2 Width <br /> 3.2.1 The bridge width shall be 14'-0"and shall be as measured from the inside face to inside <br /> face of rail. <br />
The URL can be used to link to this page
Your browser does not support the video tag.