My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sierra Pacific Industries 8/16/2020
>
Contracts
>
6 Years Then Destroy
>
2023
>
Sierra Pacific Industries 8/16/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2021 12:00:10 PM
Creation date
8/27/2021 11:56:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sierra Pacific Industries
Approval Date
8/16/2020
Council Approval Date
8/4/2021
End Date
9/30/2023
Department
Public Works
Department Project Manager
Anna Thelen
Subject / Project Title
Chaplain Gap Timber Sale
Tracking Number
0003030
Total Compensation
$5,088,424.00
Contract Type
Agreement
Contract Subtype
Purchase
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> CHAPLAIN BRIDGE INSTALLATION DETAILS,SPECIFICATIONS,AND REQUIREMENTS <br /> site. Steerable dollies are not used in the cost provided by the Bridge Manufacturer. <br /> Determining the length of bridge section which can be delivered is the responsibility of <br /> the Contractor,and shall be communicated to the Bridge Manufacturer prior to the bid <br /> date. <br /> 14.2 Installation&Lifting Procedures <br /> 14.2.1 The Bridge Manufacturer will provide a standard typical written procedures for lifting <br /> and splicing the bridge.All actual methods,equipment and sequence of erection used <br /> are the responsibility of the Contractor. Each section shall be lifted from the four <br /> lifting lugs provided. Attach rigging to lifting lugs with adequately sized rigging <br /> hardware. Rigging materials and methods are the responsibility of the Installer. <br /> Capacity of the lifting lug is 24,000 pounds at a 45-degree lift angle. <br /> 14.3 Loose Items <br /> 14.3.1 Post and Rails will be shipped loose for field installation. <br /> 14.3.2 Bearing Plate will be shipped loose for filed welding to the bottom flange of the <br /> stringers. <br /> 14.3.3 Field welding shall be performed by others,using an AWS Certified Welder. <br /> 15.0 WARRANTY <br /> 15.1 Warranty <br /> 15.1.1 The Bridge Manufacturer shall warrant their steel structure(s)to be free of design, <br /> material,and workmanship defects for a period of ten years from the earlier of the date <br /> of delivery or from 60 days after final fabrication. Wood is excluded under this <br /> warranty. This warranty shall not cover defects in the bridge caused by abuse,misuse, <br /> overloading,accident,improper maintenance,alteration,or any other cause not the <br /> result of defective materials or workmanship. This warranty shall be void unless <br /> Owner's records can be supplied which shall indicated compliance with the minimum <br /> guidelines specified in the inspection and maintenance procedures. Paint,galvanizing <br /> and other special coatings shall be warranted by the coating manufacturer and is not <br /> covered by the Bridge Manufacturer. Repair or replacement shall be the exclusive <br /> remedy for defects under this warranty. The Bridge Manufacturer shall not be liable <br /> for any consequential or incidental damages for breach of any express or implied <br /> warranty on their structures. Use of de-icing or dust prohibitive chemicals or salts to <br /> any part of the bridge structure will void this warranty. <br /> BRIDGE INSTALLATION REQUIREMENTS <br /> A. Bridge installation shall be completed no later than September 30,2022. <br /> B. Instream work is limited to the period between July 1 and September 30. If the stream is dry, operations may <br /> occur outside of this timing window if approved in writing by the Contract Administrator. <br /> C. The Contract Administrator shall be notified at least 6 weeks prior to road closure.The Contractor Administrator <br /> shall again be notified 48 hours prior to road closure. <br /> D. A prework meeting shall take place during the 48 hour notification period prior to the start of installation. <br /> Required attendees include:Contract Administrator,Project Engineer,Purchaser representative and Contractor <br /> who will be installing the bridge. <br />
The URL can be used to link to this page
Your browser does not support the video tag.