Laserfiche WebLink
5/11/2021 City of Everett Page 1 <br /> 1:10:36PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. B1603-024 Site Address 1330 ROCKEFELLER AVE 3RD FL <br /> Applied 3/9/2016 Applicant SAYLOR DEVIN Lot <br /> Approved 3/24/2016 Owner PROVIDENCE HEALTH&SERVICES Block <br /> Issued 4/13/2016 Contractor BNBUILDERS INC Tract <br /> Parent Permit No. Description TI-PROVIDENCE MEDICAL GROUP <br /> Notes NEW MEDICAL CLINIC ON 3RD FL <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> ADMIN OTHER TKJ Status Review <br /> 6/17/2016 6/17/2016 Framing KMK PartialApproval See notes Electrical,see E1606-035,Phase I. <br /> Wall framing OK in phase I. <br /> Please complete electrical rough in before <br /> cover. <br /> OK to mud&tape. <br /> 7/15/2016 7/15/2016 Grid,Bldg KlvK PartialApproval OK pending Fire <br /> Marshal inspection <br /> 8/17/2016 12/12/2018 Final Bldg KMK Unable to inspect, Please finish plumbing,michanical finals <br /> see notes before building final. <br /> Note:Electric phase I finalled by TA 8/12. <br /> Fire final for Phase I OK 7/15. <br /> (also verified with Jim Venturo) <br /> 8/19/2016 8/19/2016 Final Bldg KMK Corr Reqd See notes Re phase 1 <br /> Note:Fire OK-Jim Venturo,electrical OK- <br /> TA <br /> 1.Reverse exit lighting outside exam room <br /> 12 <br /> 2.Rotate exit sign outside office 325 <br /> 3.Mark exit sign outside 340 <br /> 8/22/2016 8/22/2016 Final Bldg KMK PartialApproval Phase I ok TCO. See Fire alarm ok final for phase I(RE Tim <br /> notes Alaniz)E1605-105. <br /> 8/26/2016 8/29/2016 Grid,Bldg KMK PartialApproval OK pending Ceiling grid in temporary reception area ok <br /> Fire/Elect. pending fir&electrical inspections. <br /> inspect.See notes <br /> 10/6/2016 10/6/2016 Framing KMK Approval See notes Walls and hard lids OK to cover <br /> 11/4/2016 11/4/2016 Grid,Bldg KMK PartialApproval See notes Ceiling grid OK to tile pending <br /> Fire Marshall inspection for sprinklers <br /> 11/16/2016 11/16/2016 Mark Final** KMK Approval (Fire Marshall final <br /> 11-16-16) <br /> 11/16/2016 11/16/2016 Final Bldg KMK Approval <br /> INSP12 <br />