My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1330 ROCKEFELLER AVE PEMC 3RD FLOOR 2021-08-30
>
Address Records
>
ROCKEFELLER AVE
>
1330
>
PEMC 3RD FLOOR
>
1330 ROCKEFELLER AVE PEMC 3RD FLOOR 2021-08-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 1:54:46 PM
Creation date
8/27/2021 2:42:18 PM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
1330
Tenant Name
PEMC 3RD FLOOR
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5/11/2021 Page 1 <br /> City of Everett <br /> 1:11:08PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E1606-035 Site Address 1330 ROCKEFELLER AVE 3RD FL <br /> Applied 6/6/2016 Applicant SAYLOR DEVIN Lot <br /> Approved 6/6/2016 Owner PROVIDENCE HEALTH&SERVICES Block <br /> Issued 6/6/2016 Contractor PRECISION ELECTRIC GROUP INC Tract <br /> Parent Permit No. B1603-024 Description POWER,LIGHTING&LV FOR 3RD FL TI-PROVIDENCE MEE <br /> Notes REMOVE&RELOCATE VAV BOXES,ADD 75KVA TRANSFORMER&225A PANELS. <br /> I <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> 6/16/2016 6/16/2016 ElecRoughln PXN PartialApproval See notes OK rough in west 1/2 to column Line 4 <br /> except 326. <br /> 6/20/2016 6/20/2016 ElecRoughIn TRA Approval OK rough walls <br /> 6/24/2016 6/24/2016 ElecRoughln TRA Approval OK both walls,hard <br /> lids <br /> 7/12/2016 7/12/2016 ElecService TRA Approval OK panels, <br /> transformer <br /> 7/14/2016 7/14/2016 Grid,Bldg TRA Approval 3rd floor OK grid/ <br /> electrical Phase I <br /> 8/11/2016 8/11/2016 Mark Final** TRA Approval <br /> 8/11/2016 8/11/2016 Final Elec TRA Approval OK final Phase 1, <br /> note GFCI as <br /> discussed <br /> 8/12/2016 8/12/2016 Final Elec TRA PartialApproval OK final Phase I, <br /> including hall baths. <br /> 8/29/2016 8/30/2016 Final Elec TRA Approval Weekend lobby <br /> buildout OK final <br /> 8/29/2016 8/30/2016 ElecRoughln TRA Approval Weekend lobby <br /> buildout OK final <br /> 8/29/2016 8/30/2016 ElecSlab/Conduit TRA Approval Weekend lobby <br /> buildout OK final <br /> 10/6/2016 10/6/2016 ElecRoughln TRA Approval Phase 2 OK rough <br /> electrical/walls <br /> 11/1/2016 11/1/2016 ElecGrid TRA Approval OK grid/electrical <br /> 11/15/2016 11/15/2016 Mark Final** TRA Approval <br /> 11/15/2016 11/15/2016 Final Elec TRA Approval <br /> 1NSP12 CR146 Y5 TEM <br />
The URL can be used to link to this page
Your browser does not support the video tag.